Text
-
-
-
,
0FFICIAL Fil.E' COPY.
a
,
JANi 9 hw
o-
I
Docket Nos. 50-321, 50-366
Georgia Power Company
,
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-321/89-33 AND 50-366/89-33
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. E. Menning and R. A Musser on November 25,.1989 to ' January 5,1990.
The.
inspection included a review of activities authorized for your Hatch facility.
At the conclusion of the inspection, the findings were discussed with those
members of your staff identified in the enclosed Inspection Report.
I
Areas examined during the inspection are identified in the : report. Within
l
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
However, because all' of the criteria for categorization of
non-cited violations were met, three violations are not being cited.
Therefors, no response to these items is required. The details. pertaining to
these non-cited violations are described in the enclosed Inspection Report.
I
,
l
In accordance with Section 2.790 of the NRC's " Rules of Practice,"' Part 2,
l
Title 10, Code of Federal Regulations', a copy of this letter and its enclosure
'
will be placed in the NRC Public Document Room.
i
l
Should you have any questions concerning this letter,-please contact us.
Sincerely,
W
i
Alan R. Herdt, Chief
E
Reactor Projects Branch 3
Division of Reactor Projects
!
- .
'
Enclosure:
(See page 2)
a
9001310271 900119
ADOCK0500g21
'
Q
'
{i
H
.TEdI .
.,
,a
s
L
. -
I
l
l
.
Georgia-Power Company
2
ggg
ygg
-
Enclosure:
NRC Inspection Report
cc w/ encl:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
J. T. Beckham
Vice President, Plant Hatch
!
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
,
H. C. Nix
General Manager, Plant Hatch
Route 1, Box 439
Baxley, GA 31513
i
'
q
S. J. Bethay
Manager Licensing - Hatch
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Shaw, Pittman, Potts and
Trowbridge
2300 N Street, NW
Washington, D. C.
20037
Charles H. Badger
'
Office of Planning and Budget
Room 610
270 Washington Street, SW
Atlanta, GA 30334
J. Leonard Ledbetter, Director
Environmental Protection Division
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
i
'
Chairman
'Appling County Commissioners
q
County Courthouse
'
Baxley, GA 31513
!
State of Georgia
"
Lbec w/ encl:
(See page 3)
,
]
t
.-
..
Georgia Power Company
3
JAN 19 W
.
bec w/ enc 1:
L' P. Crocker, NRR
A. R. Herdt, RII
K. E Brockman, RII
Document Control Desk-
NRC Resident Inspector
l
U.S. Nuclear Regulatory-Commission
Route 1, Box 725
1
Baxley, GA 31513
1
Hugh S. Jordan, Executive Secretary
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
!
i$
4
RII:
RII
LTrocine
MBrockman
01//5'/90