ML20006A956

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-293/89-12 on 891002-1119 & Notice of Violation
ML20006A956
Person / Time
Site: Pilgrim
Issue date: 01/19/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20006A957 List:
References
NUDOCS 9001310018
Download: ML20006A956 (3)


See also: IR 05000293/1989012

Text

}

r

<

,

o

l.*

!

,

3

l

l

.,

,

,

19 JAN 1980

Docket 50-293

Boston Edison Company

ATTN: Mr. Ralph G. Bird

i

Senior Vice President-Nuclear

Rocky Hill Road

Plymouth, Massachusetts 02360

Gentlemen:

Subject:

NRC Region I Inspection Report No. 50-293/89-12

This refers to the inspection conducted by the NRC Restart Staff on October 2

through November 19, 1989 at the Pilgrim Nuclear Power Station, Plymouth,-

Massachusetts. Areas examined during this inspection are described in the NRC

'

Region I Inspection Report which is enclosed with this letter.

The Restart Staff, through selected around-the-clock shift inspections and

routine program inspections, observed management controls, conduct of opera-

tions and startup testing ectivities of the licensee Power Ascension Test Pro-

gram, including licensee performance during the October maintenance mini-

outage.

Our Restart Staff determined that overall, the scheduled October maintenance

outage was conducted in a very professional, well organized and conservative

manner.

Particularly noteworthy were the conservative management decisions

made at several junctures during the outage. This item is discussed-in detail

in Section 8.0 of the enclosed report.

However, it appears that one of your activities was not conducted in accordance

with NRC requirements as set forth in the Notice of Violation, Appendix A, en-

closed herein. The violation has been categorized by severity level in accord-

ance with the NRC Enforcement Policy (10 CFR 2, Appendix C).

You are required

to respond to this letter and -in preparing your response, you ~ should follow the

instructions in Appendix A.

The violation involves failure to follow procedures associated with tagouts.

Previous failures to follow these procedures were the subject of NRC enforce-

ment action subsequent to the April 1989 RCIC system suction overpressurization

event. Even though the recent failures to follow procedures are different in

nature and of substantially lower safety significance than those of April 1989,

this area nonetheless warrants your management attention to ensure effective-

ness of corrective actions to preclude recurrence.

The response directed by this letter and the accompanying notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as re-

quired by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY

IR' PILGRIM 89-12 - 0001.0.0

01/09/90

9001310018 900119

{DR

y3

/g

ADOCK 0500

_ _ _ _

l

O

\\..9

-

-

-

,

Boston Edison Company

2

-

19 JAN 1990

4

The response directed by this letter and the accompanying notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as re-

quired by the Paperwork Reduction Act of 1980, PL 96-511.

I

Your cooperation with us in this matter is appreciated.

Sincerely,

ORIGINAL. SIGNED liy

William F. Kane, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A - Notice of Violation

!

2.

NRC Region I Inspection Report No. 50-293/89-12 w/ attachments

cc w/encls:

K. Highfill, Vice President, Nuclear Operations

R. Anderson, Plant Manager

J. Dietrich, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

The Honorable John F. Kerry

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

i

The Honorable Peter V. Forman

The Honorable Lawrence R. Alexander

The Honorable Nicholas J. Costello

B. McIntyre, Chairman, Department of Public Utilities

l

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

R. Adams, Department of Labor and Industries, Commonwealth of Massachusetts

D. Tibbetts, Acting Massachusetts Secretary of Energy Resources

Sarah Woodhouse, legislative Assistant

A. Nogee, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts, SLO Designee

1

0FFICIAL RECORD COPY

IR PILGRIM 89-12 - 0002.0.0

01/09/90

e

,

o

,,

. , ,

. . . , ,

0

Boston Edison Company

3

.

19 JAN 1990

bec w/ enc 1:

Region I Docket. Room (with concurrences)

Management Assistant, DRMA (w/o encis)

W. Russell, RI

T. Martin, RI

W. Kane, RI

J. Wiggins, RI

M. Knapp, RI

W. Hodges, RI

J. Johnson, RI

i

R. Blough, RI

'

R. Bellamy, RI

J. Durr, RI

R Gallo, RI

R. Bores, RI

l

M. Miller, RI

K. Abraham, RI

D. Caphton, RI

T. Koshy, RI

R. Paolino, RI

T. Dragoun, RI

T. Rebelowski, RI

L. Kolonauski, RI

T. Hiltz, RI

R. Mathew, RI

R. Wessman, NRR

D. Mcdonald, NRR

D. Solorio, NRR

G. Wunder, NRR

i

J Carter, NRR

P. Wen, NRR

J. Miller, NRR

,

T Cerne, SRI - Seabrook Station

J, Macdonald, RI - Vermont Yankee

M. Markley, RI - Yankee Rowe

C. Marschall, SRI - Ginna Station

T. Kim, RI - Ca1 vert Cliffs

t

C, Carpenter, RI - Pilgrim Station

i

G. Bethke, NRC Contractor

7. Dee

E00

i

i

RI:DRP

RI:DRP

.

RI-

RBloug/meo

nonf

Wdg

~usw

-

yNp'

I i

)IL 7b

0FFICIAL RECORD COPY

IR PILGRIM 89-12 - 0003.0.0

01/09/90

!

-

- _ _ - _ _ _ _ - - - _ _ _ _ _ _ _ _ _ - _ _ - _ _ - - - - _ - _ - - -

__

_

_

_.

l