c g o:
gag
]4) m o,,
NUCLEAR REGULATORY COMMISSION UNITED STATES 3.-
p,
. r,,
l W ASW NGTON, D. C. 20555
%. [,,
January 22, 1990 Docket flos.: 50-277 l
and 5047tt Mr. George A. Hunger, Jr.
Director-Licensing, MC 5-2A-5 Philadelphia Electric Company Correspondence Control Desk P. O. Fox No.195 Wayne, Pennsylvania 19087-0195
Dear Mr. Hunger:
SUBJECT:
RESPONSE TO GENERIC LETTEP 89-16 FOR PEACH BOTTOM ATOMIC POWER STATION (TAC NOS. 74876/74877)
We have reviewed Philadelphia Electric Company's letter dated October 30, 1989, in response to NRC Generic Letter 89-16, titled " Installation of a Hardened Wetwell Vent." Your intention to install a hardened wetwell vent at Peach Bottom Atomic Power Station for l' nits 2 and 3 under the provisions of 10 CFR 50.59 is acceptable. Because we view your stated intentions to be a firm commitment to install the requisite modifications, we will not proceed with the backfit analyses for Peach Bottom, Units 2 and 3.
If our understanding is not consistent with your intentions, please provide a detailed explenation of the concitments made in your response supporting the deviations from our understanding within 30 days from the date of this letter.
In the October 30, 1989 response, the effect of Individual Plant Exemination l
activities on hardened wetwell vant modifications was discussed.
In addition, the schedub for irplementation of the modifications wcs discussed, with impleraentauon currently projected to occur in the fall of 1992 for Unit 2 and fall of 1993 for Unit 3.
The use of the results of the Individual Plant Examinations to develop supplemental criteria for the vent modification design is acceptable to us, provided that it does not in any way affect the vent modification completion schedule or your commitment to make the requisite modifications under the provisions of 10 CFR 50.59. With regard to the l
discussed schedule, your schedule for completion of the requisite modifications for Unit 3 is not acceptable to the staff. We expect that all actions related to the requisite vent modifications be ecmpleted by January 1993. We, therefore, request that you re-evaluate and revise the modification schedule such that all actions are completed by January 1993.
l l
i DFol 9001290090 900122 PDR ADoCK 05000277 l3l0 P
PDC I
I I
I 2
l t
We request that you provide within 30 days of the date of this letter a' revised schedule commitment or, in the alternative, provide-(1) an explanation of why a January 1993 completion date cannot be met and (2) the bases for your proposed completion schedule. Should you have any questions concerning the above, i
please do not hesitate to contact us.
Sincerely,
/ Jus
' '. O Gene Y.
uh, Project Manager Project Directorate 1-2 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation cc: See next page l
l l
i n
o
t.,
t Mr. George A. Hunger, Jr.
Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 CC:
Troy B. Conner, Jr., Esq.
Single Point of Contact 1747 Pennsylvania Avenue, N.W.
P. O. Box 11880 Washington, D.C.
20006 Harrisburg, Pennsylvania 17108-1880 Philadelphia Electric Company Mr. Thomas M. Gerusky, Director ATTN: Mr. D. M. Smith, Vice President Bureau of Radiation Protection Peach Bottom Atomic Power Station Pennsylvania Department of Route 1, Box 208 Environmental Resources Delta, Pennsylvania 17314 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATTN: Regulatory Engineer, Al-25 Mr. Albert R. Steel, Chairman Peach Bottom Atomic Power Station Board of Supervisors Route 1. Box 208 Peach Bottom Township Delta, Pennsylvania 17314 R. D. #1 Delta, Pennsylvania 17314 Resident Inspector U.S. Nuclear Regulatory Comission Public Service Commission of Maryland Peach Bottom Atomic Power Station Engineering Division P.O. Box 399 ATTN: Chief Engineer Delta, Pennsylvania 17314 231 E. Baltimore Street Baltimere MD 21202-3486 Regional Administrator, Region I U.S. Nuclear Regulatory Comission Mr. Tom Magette 475 A11endele Road Power Plant Rese. arch Program
'i King of Prussia, Pennsylvania 19406 Department of Natural Resources B-3 Mr. Roland Fletcher Tawes State Office Building Department of Envircnment Annapolis, Maryland 21401 201 West Preston Street Baltimore, Maryland 21201 l
l l
i
0:
i
)
I We request that you provide within 30 days of the date of this letter a revised schedule comitment or, in the alternative, provide (1) an explanation of why a January 1993 completion date cannot be met and (2) the bases for your proposed completion schedule. Should you have any questions concerning the above, please do not besitate to contact us.
1 Sincerely, 4
i
/S/
i Gene Y, Suh, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of h'uclear Reactor Regulation cc: See next page lNRC PDR""["
9 Local PDR PDI-2 Reading SVarga SBoger WButler M0'Brien SGuh RClark MThadani
.0GC EJordan BGrimes ACRS(10)
[GYSD)
Previously concurred
- PDI-2/LA*
PDI-2/PM*
I-?/PM PDI-2/D i
M0'Brien GSuh:tr MThadani WButler V
01/22/90 01/22/90 i/p/90
{,) /90 l
1 1
j
o 8
L -
.p.
We request that you provide within 30 days of the date of t s letter a revised schedule commitment or, in the alternative, provide an exp anation of why a January 1993 completion date cannot be met which include the bases for your
~ "
o,,
proposed completion schedule. Should you have any ques ons concerning the above, please do not hesitato to contact us.
Sincerely.
Gene Y Suh, Project Manager
[
Proje t Directorate I-2 Divi ion of Reactor Projects 1/II Off ce of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
Docket File NRC PDR Local PD9 PD1 2 Reading SVarga DBoger WButler H0'Brien SGuh RClark MThadani OGC EJordan BGrimes ACRS(10) i i
[GYSD]
- PDf, PDI-2/PFLp MThadani PDI-2/PM PDI-2/D M04 GSuh:trq0 WButler
/g0 I h2./9
/ /90