V January 18, 1990 Docket No. 50-416
)
Mr. W. T. Cottle Vice President, Nuclear Operations System Energy Resources, Inc.
Post Office Box 469 Port Gibson, Mississippi 39150
Dear Mr. Cottle:
SUBJECT:
REVIEW 0F 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) - GRAND GULF NUCLEAR STATION, UNIT 1 (TACNO.74415)
Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the approach and method selected for performing the IPE,-(2) describe the method to be used, and (3) identify the schedule.for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated October 31, 1989, submitted in response to the reporting requirements of the generic letter. We conclude that your IPE approach, methodology and schedule are acceptable. However, as we stated in Generic Letter 88-20, we expect that utilities with extensive PRA experience, L
such as yours, will submit their IPE results on a shorter schedule than 3 years.
We,- therefore,' encourage you to submit your IPE results on a more expeditious schedule to help avoid any possible delays between your completion of the IPE E
and our. review process due to the expected backlog at the end of the 3-year L
period. We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment l:
Performance Improvement Program, will not have any adverse effect on your-schedule. However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.
l l'
Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
Sincerely, l
. b hbco 00$$$16 Original Signed By:
""U Project Directo' rate 11-1 P
PDC' Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION l
See attach page
?
, OFC :PDI
- PDII
- PDII-1
...f[
- .y
____:y...4._--:... _--_---:-------____-:-------_____:__ ____--
l
- NAME.':PAnde
- LK r:sw :E u gny
- .....
- ___f_90 4
-____:.__.f90
- 1/jf/90 DATE 1/j
- 1/)
0FFICIAL RECORD COPY (Dk Document Name:
' 7, :
)
4
,q],
a Mr. W. T. Cottle System Energy. Resources, Inc.
Grand Gulf Nuclear Station (GGNS) cc:
Mr. T. H. Cloninger Mr. C. R. Hutchinson Vice. President, Nuclear Engineering GGNS General Manager
& Support System Energy Resources, Inc.
System Energy Resources, Inc.
P. O. Box 756 P. O. Box 31995 Port Gibson, Mississippi 39150 3
Jackson, Mississippi 39286 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.
Wise, Carter, Child, and Attorney General Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, Mississippi 39205 P. O. Box 94005 l
Nicholas S. Reynolds, Esquire l _.
Bishop.. Cook, Purcell Alton B. Cobb, M.D.
I and Reynolds State Health Officer 1400 L Street, N.W. - 12th Floor State Board of Health Washington, D.C.
20005-3502 P. O. Box 1700 Jackson, Mississippi 39205 Mr. Ralph T. Lally l
Manager of Quality Assurance 1:
Entergy Services, Inc.
Office of the Governor l.
P. 0. Box 31995 State of Mississippi Jackson, Mississippi 39286 Jackson, Mississippi 39201 L
Mr. Jack McMillan, Director President, L
Division of Solid Waste Management Claiborne County Board of Supervisors l
Mississippi Department of Natural Port Gibson, Mississippi 39150 Resources l
P.- 0. Box 10385 Jackson, Mississippi 39209 Regional Administrator, Region II l
l U.S. Nuclear Regulatory Commission Mr. John G. Cesare 101 Marietta St., Suite 2900 l
Director, Nuclear Licensing Atlanta, Georgia 30323 L
System Energy Resources, Inc.
P. O. Box 469 Port-Gibson, Mississippi 39150 Mike Moore, Attorney General l
Frank Spencer, Assist. Attorney General Mr. C. B. Hogg, Project Manager State of Mississippi Bechtel Power Corporation Post Office Box 22947 P. O. Box 2166 Jackson, Mississippi 39225 l
Houston, Texas 77252-2166 Mr. H. O. Christensen Senior Resident Inspector U.S. Nuclear Regulatory Commission
. Route 2, Box 399 j
Port Gibson, Mississippi 39150 1
L l
i 5
'?
I s
DISTRIBUTION Dechet'TTIE NRC PDR Local PDR S. Varga 14-E-4 G. Lainas 14-H-3 E. Adensam 14-B-20 P. Anderson 14-B-20 R. Lo 14-B-20 OGC (For inform. Only) 15-B-18 E. Jordan MNBB-3302 M. Boyle 13-H-3 J. Flack tiLS324 ACRS (10)
P-315 Grand Gulf File LKintner
.....