'4 January 19. 1990 j
.?
g I ocket Nos. 50-445 D
and 50-446 Mr. William J. Cahill, Jr.
Executive Vice President, Nuclear
-Texas Utilities Electric Company 400 No. Olive Street, L.B. 81 Dallas, Texas 75201
Dear Mr. Cahill:
SUBJECT:
REVIEW 0F 60-DAY RESPONSE TO GENERIC LETTER 88-20 INDIVIDUALPLANTEXAMINATIONS(IPE)(TACNO.74397)
Re: Comanche Peak Steam Electric Station Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This'information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated October 30,1989, submitted in response to the reporting requirements of the generic letter. We conclude that your IPE approach, methodology and schedule are acceptable. We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will not have any adverse effect on your schedule. However, if your. schedule should change, please notify the NRC of the proposed change and the reason for the change.
Should you have any questions' concerning the requirements of the generic letter, please contact Mr.. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
Sincerely, (original signed by JHWilson for)
Christopher I. Grimes, Director Comanche Peak Project Division Office of Nuclear Reactor Regulation cc: See next page
)ISTRIBUTION
" meRetsn iem JHWilson EJordan NRC PDR JLyons BGrimes Local PDR RWarnick ACRS(10)
CPPD Reading HMalloy MSoyle ADSP Reading MFields JFlack DCrutchfield CVanDenburgh TQuay OGC
/
CGrimes JPartlow PD:NRR CP AD:CPPD:NRR D:CPPD:
iL.
MMalloy MF. hids JHWilsonp CIGrim s S O
\\D
\\
-01/q/90 Ol' 1/90 01/8/90(
01//7/90 @
\\.
9001260032 900119 DR ADOCK 05000445 PDC
'o.
r.:
Mr. William J. Cahill, Jr.
.2-cc:
Mr. Robert F. Warnick Jack R. Newman, Esq.
Assistant Director Newman & Holtzinger for Inspection Programs 1615 L Street, NW Comanche Peak Project Division Suite 1000 U. S. Nuclear Regulatory Comission Washington, D.C.
20036 P. O. Box 1029 Granbury, Texas 76048 Chief, Texas Bureau of Radiation Control i
Texas Department of Health Regional Administrator, Region IV 1100 West 49th Street U. S. Nuclear Regulatory Commission Austin, Texas 78756 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Honorable George Crump County Judge Ms. Billie Pirner Garde. Esq.
Glen Rose Texas 76043 Robinson, Robinson, et al.
103 East College Avenue Appleton, Wisconsin 54911 Mrs. Juanita Ellis, President Citizens Association for Sound Energy 1426 South Polk Dallas, Texas 75224 E. F. Ottney P. O. Box 1777 Glen' Rose, Texas 76043 Mr. Roger D. Walker Manager, Nuclear Licensing Texas Utilities Electric Company-400 North Olive Street, L. B. 81 Dallas, Texas 75201 Texas Utilities Electric Company c/o Bethesda Licensing 3 Metro Center, Suite-610 Bethesda, Maryland 20814 William A. Burchette Esq.
CounselforTex-LaElectric Cooperative of Texas Heron, Burchette, Ruckert & Rothwell 1025 Thomas Jefferson Street, NW Washington, D.C. 20007 GDS ASSOCIATES, INC.
Suite 720 1850 Parkway Place Marietta, Georgia 30067-8237
..