Advises That 891027 Individual Plant Exams Approach, Methodology & Schedule Re Response to Generic Ltr 88-20, Acceptable
ML20006A148
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/17/1990
From: Wambach T
Office of Nuclear Reactor Regulation
To: Shelton D
TOLEDO EDISON CO.
References
GL-88-20, TAC-74402, NUDOCS 9001250304
Download: ML20006A148 (2)


Text

"h January 17, 1990 DISTRIBUTION i! N S NRC & Local PDRs Docket No. 50 346 PD111 4 r/f' JHannon JZwolinski PKreutzer TWambach OGC EJordan ACRS(10) fir. Donald C. Shelton PD111-3 gray MBoyle Vice President - Nuclear JFlack Toledo Edison Company Edison Plaza - Stop 712 300 Madison Avenue Toledo, Ohio 43652

Dear Mr. Shelton:

SUBJECT:

REVIEW Of 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANTEXAMINATIONS(IPE)-DAVIS-BESSE(TACNO.74402)

Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holdcr: (1) identify the approach and method selected forperformingtheIPE,(2)describethemethodtobeused,and(3) identify the schedule for performing the IPE and submitting the results to the NRC.

This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.

We have reviewed your letter dated October 27, 1989, submitted in response to the reporting requirements of the generic letter.

We conclude that your IPE approach, methodology and schedule are acceptable. We anticipate thac any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Progrbm, will not have any adverse effect on your schedule.

However, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.

Should you have any questions cor.cerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR, at (301) 492-1308 or Mr. John H. Flack, RES, at (301) 492-3979.

Sincerely,

/s/

Thomas V. Wambach, Sr. Project Manager Proj3ct Directorate 111-3 Division of Reactor Projects - 111, IV, Y and Special Projects Office of Nuclear Reactor Regulation ec:

See next page 3/LA PD I PDf

-3/PD Office:

PD111[tzer PK6m TWambach/mw JHannon Name:

/g,/90

/ //7/90

//p/90 Date:

~90012soso4 900317 h

[,Dfi ADoCK 05000346 hL PDC

4 Mr. Donald C. Shelton Davis-Besse Nuclear Power Station l

  • Toledo Edison Company Unit No I cc:

David E. Burke. Esq.

The Cleveland Electric Rediological Health Program illuminating Company Ohio Department of Health P. O. Box 5000 1224 Kinnear Road Cleveland, Ohio 44101 Columbus, Ohio 43212 Mr. Robert W. Schrauder Attorney General Manager, Nuclear Licensing Department of Attorney _

l Toledo Edison Company General Edison Plaza 30 East Broad Street 300 Madison Avenue Columbus, Ohio 43215 Toledo, Ohio 43652 Mr. James W. Harris, Director Gerald Charnoff, Esq.

(AddresseeOnly)

Shaw, Pittman, Potts Division of Power Generation and Trowbridge Ohio Department of Industrial Relations 2300 N Street ti.W.

2323 West Sth Avenue Washington, D.C. 20037 P. O. Box 825 Columbus, Ohio 43216 Regional Administrator, Region III U.S. Nuclear Regulatory Comission Ohio Environmental Protection Agency 799 Roosevelt Road 361. East Broad Street Glen Ellyn, Illinois 60137 Columbus, Ohio 43266-0558 President, Board of Mr. Robert B. Borsum County Comissioners of Babcock & Wilcox Ottawa County Nuclear Power Generation Division Port Clinton, Ohio 43452 Suite 525, 1700 Rockville Pike Rockville, Maryland 20852 State of Ohio Public Utilities Comission l

Resident inspector 180 East Broad Street U.S. Fuclear Regulatory Comission Columbus, Ohio 43266-0573 5503 N. State Route 2 Oak Harbor, Ohio 43449 i