Forwards SSFI Insp Repts 50-361/89-200 & 50-362/89-200 on 891030-1108 & 1127-30.Weaknesses Noted Re Setpoints Improperly Delineated & Inconsistent W/Design Basis for Respective Sys & Inadequate Calibr & Surveillance Procedure
ML20005H010
Person / Time
Site: San Onofre  
Issue date: 01/12/1990
From: Holahan G
Office of Nuclear Reactor Regulation
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20005H011 List:
References
NUDOCS 9001240041
Download: ML20005H010 (4)


See also: IR 05000361/1989200

Text

- -. .

-

. - . .

-

-

-

-.

-

-

_.

's

v

,

,

-

A tic

I

f

o

UNITED STATES

4

,

'8

'g

,

NUCLEAR REGULATORY COMMISSION

e

-l

WASHINGTON. D. C. 20555

.

\\

/

January 12, 1990

,

i

Docket Hos. 50-361

l

and 50-362.

l

i

Hr. Harold B. Ray, Vice President

!

Nuclear Engineering, Safety, and Licensing Department

Southern California Edison Company

23 Parker Street

Irvine, California 92718

l

Dear Mr. Ray:

SUBJECT:

NRC INSPECTION OF SAN ONOFRE NUCLEAR GENERATING STATION

UNITS 2 AND 3, REPORT NO. 50-361 AND 362/89-200

.

This refers to the Safety Systems Functional Inspection (SSFI) conducted by the

NRC Office of Nuclear Reector Regulation during October 30 through November 8

,

and November 27 through November 30, 1989.

The inspection team consisted of

headquarters and regional personnel as well as three consultants.

!

The purpose of the inspection was to determine whether the electrical distribu-

!

tion Oystem as designed, installed, and configured at San Onofre Units 2 and 3

'

would be capable of performing its intended safety functions. During the

.

inspection, the team conducted technical reviews of the calculations and

supporting documents for this system at your Nuclear Engineering offices in

i

Irvine, California.

In addition, it conducted system walkdowns and reviews of

activities associated with this system at the San Onofre site.

l

As a result of this inspection, the team identified four general areas of

weakness which were discussed during the exit meeting on November 30, 1989.

'

The first area of weakness concerned setpoints that had been improperly

delineated and tsare not consistent with the design basis for the respective

!

systems. The seccnd area of weakness concerned inadequate calibration and

surveillance procederes. Three of the team's findings were related to

.

procedures tnd documents that were inadequate in ensuring that the selected

'

setpoints are properly translated into appropriate equipment settings.

]

The third area of weakness identified by the inspection team was in the area of

maintenance. Two of the team's findings, the improper evaluation of diesel.

I

piston measurements, and the numerous hardware deficiencies identified during

the team's walkdowc inspections of Units 2 and 3, were the apparent result of

inattention to detail and are not indicative of a strong maintenance program.

These findings were further substantiated by your walkdown, performed after the

first half of our inspection, during which numerous documentation and data

entry errors were identified.

O

'

'9001240041 900112

./

.

ADOCKOSOOgi

DR

1

],

, l r ' ; o f> r (

1

- v

l

>> v

(~

.

. - .

.

. - -

-

. -

.

__

-

-

,

__ _

s

,

,

i

s

.

,

Mr. Harold B. Ray

-2-

January 12, 1990

The f ourth area of weakness concerned the lack of adequate, auditable calcula-

tions as necessary to ensure that the design basis for the current electrical

distribution and associated systems had been met. We believe the lack of

formal calculations has added to the uncertainty regarding the implementation

of the design-basis of certain systems.

The team also identified several design strengths during the inspection. We

found your imediate actions taken as a result of our findings to be both

thorough and prompt,

in addition, your current design-basis reconstitution

effort was seen as a way of resolving some of the deficiencies identified by

the inspection team.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room. Any specific enforcement

actions resulting from this inspection will be identified by the Region V

staff in separate correspondence.

You are requested to respond to this office within 60 days to inform us of the

action taken related to the deficiencies identified in the enclosed inspection

report and the date that these actions will be completed for follow-up inspec-

tion. Should you have any questions concerning this inspection, please contact

the NRR Project Manager, Lawrence Kokajko, or the inspection team leader,

Jeffrey Jacobson. Messrs. Kokajko and Jacobson can be reached at

(301) 492-1380 and (301) 492-0996, respectively.

Sincerely,

l

Gary M. Holahan, Acting Director

Division of Reactor Projects Ill/IV/V

and Special Projects

Office of Nuclear Reactor Regulation

Enclosure:

NRC Inspection Report

50-361 and 362/89-200

cc w/ enclosure:

See page 3

Distribution:

See page 4

  • See previous concurre1ce

RSIB:DRIS

R

R

S

RSIB:DRIS

RV % /f 4 SC:R$18:DRIS

.

  • @Jacobson:bt SVAthavale

T

g

  • JDWilcox

FGees.J,r.h,'*EVImbro

01/10/90

01/H/90

01//I49

01/10/90

01//o/90

01/10/90

C:RSIB:DRIS

DD

IS:NRR

pf'

DR b 'IH d'
  • WDLanning

G a nas BKGn

GM

V

k

1/i /90

01/10/90

01////90

01/ // /90

ab

-. .-

-

..

-

i,

,

,

, .

s

.

,

Mr. Harold B. Roy

-3-

January 12, 1990

'

!

cc w/ enclosure:

,

Charles R. Kocher, Esq.

Mr. F. B. Marsh, Project Manager

i

James A. Beoletto, Esq.

Bechtel Power Corporation

Southern California Edison Company

P.O. Box 60860

Irvine Operations Center

Terminal Annex

23 Parker Street

Los Angeles, California 90060

Irvine, California 92718

Mr. Robert G. Lacy

Orrick, Herrington & Sutcliffe

Manager, Nuclear Department

'

ATTN: David R. Pigott, Esq.

San Diego Gas & Electric Company

.

600 Montgomery Street

P. O. Box 1831

San Francisco, California 94111

San Diego, California 92112

j

l

Alan R. Watts, Esq.

Mr. John Hickman

l

Rourke & Woodruff

Senior Health Physicist

l

701 S. Parker St. No. 7000

Environmental Radioactive Ngmt. Unit

i

,

Orange, California 92668-4702

Environmental Management Branch

!

!

State Department of Health Services

l

Mr. Sherwin Harris

714 P Street, Room 616

Resource Project Manager

Sacramento, California 95814

Public Utilities Department

City of Riverside

Resident Inspector, San Onofre NPS

3900 Main Street

c/o U.S. Nuclear Regulatory Comission

+

Riverside, California 92522

Post Office Box 4329

.

San Clemente, California 92672

Mr. Charles B. Brinkman

Combustion Engineering, Inc.

Mayor, City of San Clemente

l

12300 Twinbrook Parkway, Suite 330

San Clemente, California 92672

'

I

Rockville, Maryland 20852

Regional Administrator, Region V

,

.

Mr. Phil Johnson

U.S. Nuclear Regulatory Comission

l

U.S. Nuclear Pegulatory Commission

1450 Maria Lane / Suite 210

Region V

Walnut Creek, California 94596

1450 Maria Lane, Suite 210

Walnut Creek, California 94596

Chairman, Board of Supervisors

-

San Diego County

Mr. Don Womeldorf

1600 Pacific Highway, Room 335

Chief Environmental Management Branch

San Diego, California 92101

California Department of Health

714 P Street, Room 616

.

Sacramento, California 95814

,

7

F

r

+

,-

-

.,

- .

-

4 -

.

-- -

m

&

-

-

- -.

-

-

..

'

,

.

,

,

.

,

,

Mr. Harold B. Ray

-4-

January 12, 1990

,Distrib r, ion:.. ...

. . ~ .

.

tsectet flies 50-361.andL362.

RSIB R/F

DRIS R/F

TEMurley, NRR

JHSniezek, NRR

BKGrines, NRR

GClainas, NRR

WDLanning, NRR

EVlmbro, NRR

JBJacobson, NRR

RLSpessard, AEOD

GWKnighton, NRR

LEKokajko, NRR

.

CWCaldwell, SRI San Onofre

Regional Administrators

Regional Division Directors

Inspection Team

LPDR

PDR

ACRS(3)

OGC (3)

,

IS Distribution

l

I

l

J

d'

(

  1. 484&

e6

=

0

&#

Oh h +-4 dPJ

-&J"

N

44-82b++-

J

d

a

b

dfl.

A

'4

1

.r

---

\\q~

~ q-

,

-

.

- . .-s .-

x

),

y

,

. .

.

.

,

>

4

l

l

.- q

I

.!

!

l

'

.

I l

.

'i

1
I

'

(

.. g

'

-

,

.

.i

!

'i

.y

+

- e

,

.

,

. ,

. . . . .

,

5 ,

.

.

'

' :

fc

.

.

.

m.

  • .

.,a

" +

'

>"-

,.

s

, . g

W

5

'

tl.ws$di.ed

- -

i

4 ,

gut %ggfl4o

a

.

3

j{f

-

1

-

r

1

L.

-,

.

.

Q ch

. M &9 ().

a

,,n,

- .

.

. -

-

-

-,

,s.,

-

O

i

'd-

i

-

4

,..

'r

"

') '-

5

-

.