Text
y=. --
1
\\
o s.
s i
t OPERATIONS NARRATIVE Cooper Nuclear Station j
i December 1989 g
l Following a scram on November 25,
- 1989, the generator was p.
synchronized to the grid at 1710 on December 1.
. Normal plant cperation continued for the remainder of the month with no significant. power reductions.
A capacity factor of 95.1 percent was achieved for the month of December.
i I
l J
R
b i..
4 1
- i. -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE January 8.
1990 TELEPHONE (402) 825-5291 MONTH December 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Nat)
'l 39 17 762 2
494 18 769 3
679 19 768
-1 4
691 20 769 1
5 686 21 769 6
770 22 768 7
770 23 768 8
770 24 761 9
772 25 771 L
10 763 26 772 l
l.
11 771 27 772 12 772 28 773 13 770 29 772 14 771 30 772 15 768 31 707 16 768 INSTRUCTIONS L
on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l-l
y I
' ' ' ~
CPE'4.ATING DATA REPORT C.
I i'., -
DOCKET NO.
050-0298 UNIT CNS DATE Januarv 8.
1990 OPERATING ST&TUS TELEPHONE (402) 825-5291 l
l I
1.
. Unit Name:
(Wmar Nuciant Station Notes 2.
Reporting Period:
M 10A0 l
c 3.
Llooneed Thermal Power (MWt):
2381 4.
' Nameplate Rating (Gross MWe):
838
- 6. -
Design Electrical Rating (Not MWo): 778 l
. 6.
Maximum Dependable Capaalty (Grose MWe): 787 7,.
Maximum Dependable capardty (Not MWe):
764
- 6. -
if Changes Ooour in Capeoity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
J l
9.
Power Level To Which Restricted, N Any (Not MWo):
)
- 10.
L Romeons For Restriction,if Any:
j This Month Yr. to Date Cumulative 11.'
' Hours in Reporting Period 744.0 8.760.0 135.913 0 12.
Number of Hours Reactor Was Critical 737.1 6.672.9 102.648.2 13.
Reactor Reserve Shutdown Hours -
0.0 0.0 0.0 14.
Hours Generator On Une 726.8 6.597.1 101.031.7
- 15.
Unit Reserve Shutdown Houre 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 1.711.20Q&,
14.952.336.0 202.683.060.0 17.
Gross Electrical Energy Generated (MWH) 560.143.0 4.943.052.0 65.335.873.0 18.
Not Electrical Energy Generated (MWH) 540.585.0 4.785.961.0 63.015.195.0 19.
Unit Servios Footor 97.7 75.3 74 3 20 '
Unit AvailabilityFactor 97.7 75.3 74.3 21.
Unit Capacity Footor (Usin0 MDC Net) 95.1 71.5 60.7 22.
Unit Capacity Factor (Volng DER Net) 93.4 70.2 59 6 23.
Unit Forood Outage Rate 2.3 66 4.8 24.
Shutdown Scheduled Omr Next 6 Months (Type, Date, and duration of Each):
Refuelina and Maintenance Outaae 13. Scheduled March 1990: 8 week duration 26.
If Shut Down At End of Report Period, Estimated Date of Startup:
26.
Units in Test Status (Prior to Commercia! Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- _g
'A
.e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-02 %
UNIT NAME Cooper Nuclear Statiori-DATE n n = ry a_ 1990 COMPLETED.BY.
J.
E. Thompson REPORT MONTH _ December 1989 TELEPHONE (402) 875-3811 Method of Licensee Cause & Corrective 4
5
'" t I" "III""
7"I'"
"I 1
2 3
No.
Date Type (Hours)
Reason Down Reactor Report
- Code Code Prevent Recurr N e i
89-11 891125 F
17.2 A
3 89-026 LS FLT, TS Continuation of shutdown 89-11 to December 1 (see previous submittal for deta:Is).
i 1 F: Forced 2 Reason:
3 Method:
4 Exhibit C - Instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatic Scram Report (LER) File (NLREG-0161)
D - Regulatory Restriction Continued E - Operntor Tralning & License Examinnt f on 5 - Redesced lonel 5 Ext:f h t t 1 - Same Sewarce F - Administrative 6 - Other G - Operational Error (Explain)
H - Other (Explain)
. - ~.
~.
.