Forwards Safety Evaluation Accepting Util Response to Generic Ltr 88-01 Re IGSCC in BWR Austenitic Steel Piping,W/ Exception of Licensee Position Concerning Leakage Limits
ML20005G392
Person / Time
Site: Fermi 
Issue date: 01/04/1990
From: Stang J
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20005G393 List:
References
GL-88-01, GL-88-1, TAC-69135, NUDOCS 9001190090
Download: ML20005G392 (4)


Text

-

p& ~,,4W &hnv

);h E' fh UNITED STATES

? " '

NUCLEAR REGULATORY COMMISSION o

fy J.'

WASHINGTON, D. C. 20655 l

+

- /

January 4, 1990-

    • ..+ -

. Docket No. 50-341 i

y, L r.IB. Ralph Sylvia H

. Senior.Vice President - Nuclear l

-Operations ~

1 Detroit-Edison Company 16400 North Dixie Highway <

. Newport, Michigan.48166-

Dear Mr. Sy._1via:

M

' ~ NRC' POSITION-ON IGSCC IN BWR AUSTENITIC STAINLESS STEEL PIPING t

SUBJECT:

GENERICLETTER(GL)88-01(TACNO.69135)

?

25, 1988,- the NRC issued GL 88-01. The GL requested iicensee's to lOnJanuary

..W respond within 180 days.of receipt of the letter regarding.IGSCC in austenitic r

. stair.less steel piping..By letter dated August 5, 1986, Detroit Edison Company

.(DECO)1 responded to GL 88-01. -By letter dated March 16, 1989, the NRC recuested

.f additional information.; Dy letters dated April 27 and May 12,1989,LDEco o

provided additicnal information.

E Enclosed is the-NRC staff Safety' Evaluation.

Based on the Safety Evaluation, 1the staff finds ~the Deco responses to GL EC-01 are complete'and acceptable with exception of the licensee's position concerning leakage limits.

The. position concerning the tine from when a reactor is required to shutdown

-when unidentified reactor coolant leakage exceeds 2 gallons per minute changed-Lin' GL: 88-01 zfrort 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Fermi-2 Technical Specifications (TS) currently' requires plant shutdown when unidentified reactor coolant leakage exceeds 2 gpm cver a 4-hour period which is a less conservative rate than the'-

limit' set in GL 88-01. The position of GL 88-011is to reduce the total reactor ccolant leakage. Therefore, we' request that DECO either propose a change to the'Formi-2 TS to be consistent with GL 88-01 concerning the leakage. limit or provide. justification for maintaining the current TS limitations given out.

' desire to reduce the total reactor coolant leakage.

y W(\\

t 9001190090 90 W 4 f

PDR-ADOCL 0500 341 W

.]

RM rL..

.c.

p,g :.

m,

-2 ~

4.

e With the exception of the_ Technical: Specification issue, this completes our-review of:GLc88-01 and we consider TAC No. 61935 closed.

Your response on the

-Technical Specification question will be considered as a separate review effort.'

-Please provide.a' projected schedule for your response, Sincerely, T

3-

..SIGIftMtIgft9dby.

j g*

l John F. Stang, Project' Manager Project. Directorate 111-1 Division of Reactor Projects - III, a-IV, V & Special Projects y

l-Office of Nuclear Reactor Regulation As stated

-cc'w/enclosuret

~

lSee next page y

DISTRIBUTION 4

6-ACRS(10) m

.NRC & LOCAL PDRs

.PSHUTTLEWORTH

CCHENG -

- TMCLELLAN

-PD31 GRAY FILE

.WK00 L

JTHOMA:

JZWOLINSKI-

'JSTANG OGC i

~EJ0 ROAN <

j e

  • See pre'vious concurrenc b
  • LA/PD31:DRSP
  • PM/

1:DRSP*

31: DRSP.

~*EMTB/DET

.PShuttleworth JStl cr'

'J oma CYCheng

12/15/89--

N '^ ^

12

/89 12/4/89 R

llh90 bVl{}

^

l FERMI TAC 69135 s

y f

L' i

g %

(

. i' b

.t

.J s

..c 2-LWith the exception of the Technical Specification issue, this completes our review.of GL 88-01 and we consider TAC No..-61935 closed.- Your response.on the e

Technica1' Specification question will be considered as a separate review effort.

Please provide a projected _ schedule for your response..

Sincerely,

(

W w D.d.

Sngi John F. Stanr, Project Manager.

Project Directorate III-l' Division of Reactor Projects - III, IV, V & Special Projects.

Office of Nuclear Reactor Regulation

-As stated-cc w/ enclosure:

See next page s

l l

n

~

s.

, tp

o. -

w J

Fermi-2 Facility

- Mr. B. Ralph Sylvia '

- Detroit Edison Company-9 cc:

Mr. Ronald C. Callen Ms. Lynne Goodman

~

. Adv. Planning Review Section Supervisor - Licensing a

~

'. Michigan. Public Service Comission -

Detroit Edison Company.

1

. 6545 Mercantile Way Fermi Unit 2 P.~.0. Box-30221-6400 North Dixie Highway Lansing, Michigan A8909 Newport, Michigan 48166 John Flynn,l Esq.~ :

Senior Attorney Detroit. Edison Company.

2000 Second Avenue-

~

Detroit, Michigan 1 48226'

r

- Nuclear Facilities and Environmental-1' Monitoring Section Office Divisionfof Radiological Health:

- P. O. Box 30035 Lansing, Michigan 48909 lir. Walt Rogers.

d

^

U.S. Nuclear Regulatory Comission

. Resident Inspector's_ Office

. 6450 W. Dixie-Highway.

Newport, Michigan 48166 Monroe County Office of' Civil.

Preparedness ~

- 963~ South =Raisinville

' itonroe, Michigan 48161 1

Regional Administrator, Region III U.S.. Nuclear Regulatory Commission 799 Rocsevelt Road.

-Glen Ellyn, Illinois 60137 4