Advises That Licensee 891031 Response to Generic Ltr 88-20 Re Individual Plant Exams Acceptable,Except for back-end Analysis Methodology.Nrc Evaluation of Idcor Individual Plan Evaluation Methodology for PWRs Encl
ML20005G358
Person / Time
Site: Summer 
Issue date: 01/12/1990
From: Hayes J
Office of Nuclear Reactor Regulation
To: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20005G359 List:
References
GL-88-20, NUDOCS 9001190041
Download: ML20005G358 (4)


Text

._ _

  • **je cg'g UNITED STATES

^y

-[

NUCLEAR REGULATORY COMMISSION

,~.3 WASHiesGTON, D. C. 20006 1*g January 12, 1990 i

Docket No. 50-395 Mr. O. S. Bradham.

Vice President, Nuclear Operations South-Carolina Electric & Gas Company Virgil C. Sumer Nuclear Station P. O. Box 88 Jenkinsville, South Carolina 29065

Dear Mr. Bradham:

SUBJECT:

REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUAL PLANT EXAMINATIONS (IPE) - VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 (TAC NO. 74475)

Generic Letter 88-20 requires, in p) art, that each operating reactor licensee and construction permit holder: (1 identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the. schedule for performing the IPE and submitting the results to the NRC.

This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.

We have reviewe0.> cur letter dated October 31 1989, submitted in response to the reporting requirements of the generic Iutter. We conclude thst your IPE epproach, methodology and schedule are acceptable excepte as noted below.

We knticipate that any possible additional analysis or reporting requirements, e

such &s those from external events or from the Containment Perfomance improve-ment Program, will not have any aaverse effect on your schedule.

iiowever, if your schedule should change, please notify the NRC of the proposed change and the reason for the change.

'Wa note that you proposed a Level 1: analysis with only five containment event tree nodes.

Please refer to the enclosed attachment that was sent in a letter from A. Thadani, NRC, to W. Rasin, NUMARC, datea November 22,1988, " Staff Evaluation of IDCOR IPEMs," in which we expressed concern about limited containmenteventtrees(CETs).

The letter identified areas in the IDCOR back-end IPEM analyses, limited CETs, similar to your proposal, that were too narrowly focused, resulting in an unacceptable methodology. We recommend that you revise your back-end analysis methodology in light of that letter and the requirements of the generic letter.

[0 9001190041 900112 PDR ADOCK O COO 395 P

PDC g

\\

1

(.

'4

.a; 9

+

l 4

Mr. O. S. Bradham January 12.-1990 Should you have any questions concerning the requirenants of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John 4

H. Flack,RESat(301)492-3979.

)

1 Sincerely, 6+

Ronnie Lo/for j

t' '

John J. Hayes, Jr... Project Manager-Project Directorate 111 Division of Reactor Projects. I/II i

Office of Nuclear Reactor Regulation 3

i

Enclosure:

l

'As stated cc w/ encl:

l

. See next pans

?..

DISTRIBUTION-qi 4,.:

9 o sttachlage.

1 J

l 1

)

l-l n.

a 0F0 :PDH }

ll

PDII.1
PDII-l
.......j
.....
..y.

lNAME:PArj llayes:s Tourigny J

l DATE :1/g W 90 1/p/90

1/p,/90 0FFICI AL RECORD COPY Document Name:

SUmER IPE ACCETANCE LTR 1

.)

g;.

g tm?

g; ; s -::

,, c,l; # o..

2>it ee- -:- o a.

DISTRIBUTION

-,ur s.,.s 4'_

assemecM4e,

I

.NRC PDR

~ ;

Loca):PDR

'i r<

S.'Varga 14-E-4

'x, G. Lainas-

'14-H-3 4

t

.o E. Adensam 14-B-20 1

0 ' M' P. Anderson

'14-B :

R' Lo..

14-B-20'

? OGC- ( For -inform." Only) 15-B-18' E. Jordani

~

NNBB-3302 M.LBoyle

.13-H-3 i- '

- J. Flack.

tiLS324 i

. ACRS : (10).

.P-315 o

~ Summer File q

, JHayes.

l 4

lf-l 4

i l

l L

-. {

p

--s 1

l 1

{

1 2

\\

i.

j

?

\\

i p

l 1

,?

I i

i n

4 ll i.

l l

1+

2

y';

,,e

w en

~1

. o -.. e

,. a r 4

  • p.c E

Mr. ' O. S./ Bradham -

- South Carolina' Electric & Gas Company.

Virgil C. Summer Nuclear. Station.

'e CC '

s

?

Mr. R. V. Tenner:

Executive Vice President'.

L Tv S'C. Public. Service Authority l'

. P. 0. - Box 398)-

i 1

Moncks: Corner, South. Carolina 29461-0398.

?1

! J.: B. Knotts, Jr.. - Esq.; '

L

' Bishop, Cook, Purcell a

L-and Reynolds

1400 :L Street, N.W.c.

1 Washington, D.- C. : 20005-3502 Resident Inspector / Summer NPS.

~ /o~ U.S. - Nuclear Regulatory Commission c

y g<

l;

-Route 1,. Box-64'.

q Jenkinsville, South Carolina ' 29065-

)

?

Regional Administrator, Region. II U.S. Nuclear Regulatory Commission, E

101 Marietta Street, N.W., Suite 2900 H

Atlanta, Georgia ~. 30323

-Chairman, Fairfield County' Council P.-0.: Box.293 J Winnsboro, South Carolina ; = 29180 l

1 fir. : Heyward G. "Shealy, Chief Bureau of Radiological Health -

n South-Carolina-Department of-Health

.and Environmental Control

' 2600- Bull-St reet pn

' Columbia, South Carolina-29201 South Carolina Electric &' Gas Company Mr. A -R. Koon, Jr., Manager

. Nuclear Licensing-Virgil'C. Summer Nuclear Station P. O. Box 88-

Jenkinsv111e, South Carolina 29065

.g L

l