REACTIVITY CONTROL SYSTEMS
} q,_ 3g,, g jg g-3/4.1.'3 MOVABLE CONTROL ASSEMBLIES Lunp.,ino Prahinh
- * "N
' GROUP HEIGHT 9euh,afiw brckn L.eh q
. LIMITING CONDITION FOR OPERATION 9"PM-3.1.3.1 All full-length shutdown and control rods shall be OPERABLE and positioned within i 12 steps (indicated position) of their group step counter
- demand-position.
APPLICABILITY: MODES 1*.and 2*.
ACTION:
' The ACTION to be taken is based on the cause of inoperability of control rods
~
as follows:
Any immovability of a control rod initially invokes ACTION Statement 3.l'.3.1.a.
Subsequently ACTION Statement 3.1.3.1.a may be exited and ACTION Statement 3.1.3.1.d invoked if either the rod m
control urgent failure alarm is illuminated or an electrical problem is detected in the rod control system.
l ACTION I
I More Than
. CAUSE OF INOPERABILITY One Rod One Red 1.
Immovable-as a result of excessive (a)
(a) friction or mechanical interference or known to be untrippable.
'2.
Misaligned by more than i 12 steps (c)
(b)
(indicated position) from its group step counter demand height or from any
- other rod in its group.
-3.
Inoperable due to a rod control urgent (d)
(d) failure alarm or other electrical problem in the rod control system but trippable.
ACTION a.- Determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION b.- Be in HOT' STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
ACTION c.- POWER OPERATION may continue provided that within 1 hour:
1.
The rod is restored to OPERABLE status within the above alignment requirements, or 2.
The rod is declared inoperable and the remainder of the rods in the group with the inoperable rod are aligned to within i 12 steps of the inoperable rod while maintaining the rod sequence and insertion limits of Figures 3.1-1 and 3.1-2.
The THERMAL POWER level shall be restricted pursuant to Specifica-tion 3.1.3.6 during subsequent operation, or "See Special Test Exceptions Specifications 3.10.2 and 3.10.3.