Forwards Insp Repts 50-361/89-32 & 50-362/89-32 on 891204-07.No Violations or Deviations Noted
ML20005G104
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/27/1989
From: Huey F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20005G105 List:
References
NUDOCS 9001180136
Download: ML20005G104 (3)


See also: IR 05000361/1989032

Text

p

%

PDA

_ a,,,ea

4

180 CLEAR RESULATORY C00m418860N

asecos v

'

WALwuTYatK

of Nees

P

DEC 2 71999

Docket Nos. 50-361. 50-362

Southern California Edison Company

Irvine Operations Center

23 Parker

Irvine, California 92718

Attention: Mr. H. B. Ray, Vice President

Nuclear Engineering, Safety and Licensing Department

Gentlemen:

SUBJECT: NRC INSPECTION OF SAN ONOFRE UWITS 2 AND 3

This refers to the special, unannounced inspection conducted by Mr. T. Meadows

and Mr. T. D'Angelo, of this office, from December 4,1989 through December 7,

1989, of the activities authorized by NRC License Nos. NPF-10 and NPF-15, and

to the discussion of our findings held by Mr. Meadows with members of your

staff on December 8, 1989.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

No violations or deviations were identified during this inspection. Our

inspectors observed an improved working relationship between your corporate

engineering and site engineering staffs. The staff engineers interviewed from

both of these groups exhibited a good integrated systems "as built" technical

knowledge, indicating improvement in your configuration control and oversight

program.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Rf=&

F

p

--

g

'i

bv

-\\

F.R.Huey,dctingChiefg

Reactor Projects Branch

Enclosures:

Inspection Report Nos. 50-361/89-32 and 50-362/89-32

_

.760/

"

_ _ _ _ - - _ _ _ - _ _ _ - - _ _ - _ _ _ - _ .

_

'd;,-

- u

7

'

4

- [.

DEC t 71999

e

. .-

H. B. Ray

2

j'l

'

.CC W/thClosure:

..

D. J. Fogarty Executive Vice President, Nuclear Engineering &

Operations

R. H. Bridenbecker, Vice President and Site Manager

H. E. No an. Station Manager

.

State of alifornia

'

.

I;

i

/

p

!c:.

'

f *' ^

.

DEC 2 71989-

f

H. B.-Ray

3

p

~

bec w/ enclosure:

Docket File

Project Manager

Project Inspector

'

C. Caldwell, SRI. SONGS

T. D' Angelo, SRI, Rancho Seco

T.. Meadows RV

G. Cook, RV-

B. Faulkenberry, RV

J. Martin, RV

N. Western, RV -

R. Zimmerman,-RV

A. Chaffee, RV.

R. Huey, RV

f Mxvi N8l

bec w/o enclosure:

M. Smith

J. Zo111 coffer

RV/jk

R W EST COPY ] R UEST COPY ] $ @;S' /EST COPY ]

/VEF / N0

h YE

/ N0

la

NO

]

-

-

SEND TO PDR J

w

fiE3 / NO

l'

MEADOWS #~ -

L MIL

HUEY

12/4 r/89

12//,$29

12/#7/89

?. 3W

GAA

%~uJ A W

H

it/17

1

,

-