, NUCLEAR REGULATORY COMMISSION UNITED STATES'
['
M}.-
wAssiworow. o. c. eosss.
p n.:
.r January 5,1990 Docket, No. 50-302.
t Mr. Percy M. Beard,' Jr. _
i
. Senior: Vice - President, Nuclear. Operations.
4 Florida P(wer Corporation-ATTN:. Manager, Nuclear Operations Licensing.
7-P.' O. Box 239-NA-21 h-
. Crystal River, Florida 32629
Dear.'Mr. Bea'rd:
SUBJECT:
CRYSTAL RIVER UNIT 3 -- EMERGENCY DIESEL-GENERATOR POST-MODIFICATIOM
~REQUALIFICAT!0flTESTINGPROGRAM(TACNO.67801) l-L
.We have reviewed the additional information which you submitte'd in your letter c
K of' December 22, 1989 regarding the scope of the emergency diesel generator (EDG)
L
' post-modification requalification testing program.. We find your. proposed test i
program-to be acceptable with certain clarifications which were discussed with -
'and agreed to' by your staff in a telephone discussion on December 28, 1989.
j m
K This ~1etter confirms our understanding of your test program, as discussed with ryour staff in that -telecon.: The citations below reference portions of your
. Decerter 22, 1989 letter.;
1 L
- 1; The. statement in-Attachment I under Disposition of NRC Position, "....
L tests already were or.will become a part 'of the FPC test program as -
L' requested"', is understood'to mean as requested by the NRC letter to FPC p
dated September 25, 1989, 2.
LItem 12 of Test 8, Reliability Tests in Attachment 1, means that the minimum
.of'30 valid consecutive start / lead tests without failure will be done at p
12-hour-interyals~ or after cooldown to nornal standby temperature, whichever a
occurs first..
-l 3.
Regarding Item 2 of Test 8 Reliability Tests in Attachment 1, we agree that?
EDG1"A"' can be considered OPERABLE for Modes 4 through 6 following success-
- ful completion of the testing program recournended by the EDG manufacturer.
K However, no fuel handling should be -carried out following failure of any
-test:until appropriate corrective actions have been implemented and the L
EDG is again declared operable. Testing should then be resumed to obtain y
at least 30 consecutive successful tests.
7 4.
Regarding Item (8) cf Attachment 2, if FPC declares EDG "B" OPERABLE following the completion of upgrade modification but is unable to conplete the reliability' testing during the Refuel 7 outage, the minimum of 30 y e L
valid consecutive start / load tests without failure shall be performed as for EDG "A" and shall be completed as soon as possible after declaring it OPERABLE, by conducting a minimum of 2 tests per week.
9001160345.900105 r
PDR ADOCK 05000302 p
Y, P
PDC i
g e
- w.
p
p h. y :. m "N
Mr. Percy M. Beard, Jr.
Crystal River Unit No. 3 Nuclear Florida Power Corporation _
Generating Plant CC:
Mr.~A. H. Stephens-State Planning and Development General Counsel' Clea ringhouse i
Florida Power Corporation Office of Planning and Budget MAC - A5D:
Executive Office of the Governor-
-P..0. Box 14042.
The Capitol' Building St.. Petersburg-Florica - 33733 Tallahassee, Florida 32301-
. Nr. ' P. F. McKee, Director Chairwan Nuclear Plant Operations Board of County Commissioners
. Florida Power Corporation' Citrus County l
-P.-0. Box'219-NA-2C
'110 North Apopka Avenue -
Crystal River, Florida :32629 Inverness, Florida: 32650 Mr. Robert B., Borsum Mr. Rolf C. Widell, Director Babcock & Wilcox Nuclear Operations Site Support i
huclear Power Generation Division Florida Power Corporation 1700:Rockville Pike, Suite 525 P. O. Box 219-fM-21 Rockville, Maryland 20852 Crystal River, Florida 32629 Senior Resident Inspector Mr. Gary L. Boldt L'
Crystal River Unit' 3 Vice President, Nuclear Production
- U.S. Nuclear Regulatory Comission Florida Power Corporation
- 15760 ' West Powerline Street P.~0. Box 219.-SA-2C' Crystal River, Florida 32629 Crystal Rivar, Florida 32629 u
Regional Administrator,; Region II l
10.S. Nuclear: Regulatcry Comission
- 101 liarietta Street N.W., Suite 2900 Atlanth. Georgia 30323 4
fir.-Jacob Deniel Nash-Office of Radiation Control-E
' Department of Health and Rehabilitative Services
^
1317 Winewood Blvd.
H Talle.hassee, Florida 32399-0700 Administrator
/
Department of Environmental Regulation i
Power Plant Siting Section State of Florida
?
2600 Blair Stone Road L
Tallahassee, Florida 32301 Attorney General Department of Legal Affairs The, Capitol.
l.
Tallahassee, Florida 32304-l-
t
,M
a A. n..
i b
8 fs jE ;.y. 7. z H
' Mr~. P. M. r Beard
-- 2 January 5,1990 4
D We believe'that this. test program, when completed successfully in accordance l
s,
?
with these understandings, will provide reasonable ' assurance ~ of the capabilities I
'of the upgraded-EDGs.
Should you disagree with any-of our understandings, as
- discussed in this'1etter, please notify us _innediately.
Sincerely,
p y
i rL Original signed by t
Herbert N. Berkow, Director-q Project Directorate 11-2 Division of Reactor Projects - I/II-Office of Nuclear Reactor. Regulation q
cc: =See next page 1
DISTR j f] b I
JUO!E L PDR s '.
PD22'Rdg
- SVarga 14/E/41 Glainas 14/H/3-
. ilBer kow HSilver.
0GC:.
EJordan
- ACRS(10)
' MSinkule-DMiller I.
L
. LA
-2 1
- NRI',: SEg :D:PDII-2
- LOFC
- - NAME
- D r.
. Sil r:jd : FRosa
- H rk)
.....:............:...h........:............:...[........:............:............:.........
DATE -:01/ p/_ 0
- 01/ /90-
- 01/4/90
- 01/
90 9
l,-
0FFICIAL RECORD COPY L