Forwards Insp Repts 50-317/89-31 & 50-318/89-32 on 891001- 1130.Programmatic Weaknesses Noted in Tracking & Completion of Corrective Actions.Enforcement Conference Scheduled on 900111 in Region I to Address Listed Matters
ML20005E986
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/03/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20005E987 List:
References
NUDOCS 9001120139
Download: ML20005E986 (2)


See also: IR 05000317/1989031

Text

7

q

e

..

<

- :

)

4

.

1

L

JAN 031990

!

'

Docket / License Nos.: 50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN: Mr. George C. Creel

L

Vice President, Nuclear Energy

Calvert Cliffs Nuclear Power Plant

>

MD Routes 2 & 4

'

Post Office Box 1535

i

Lusby, Maryland 20657

Gentlemen-

!

i

,

Subject: NRC Region I Combined Special Inspection Report Nos. 50-317/89-31

i

and 50-318/89-32 (October 1 to November 30,1989)

,

,

The enclosed report transmits the findings of the subject inspection at the

Calvert Clif fs Nuclear Power Plant, Lusby, Maryland.

The inspection examined

corrective action implementation in the area of low temperature overpressure

i

protection

for

the

reactor vessel.

The

findings were discussed with

,

Mr. L. Russell and members of your staff.

.

,

The inspection identtfied programmatic weaknesses in the tracking and comple-

!

tion of corrective actions. Of particular concern were the inspection findings

!

of multiple omissions,. deficiencies and errors in assuring adequate reactor

vessel low temperature overpressure protection.

Accordingly, we have scheduled an Enforcement Conference on January 11, 1990,

i

at 2:00 p.m.,

to discuss these matters with you in the NRC Region I Office in

'

King of. Prussia, Pennsylvania. We will forward an appropriate notification of

'

enforcement action af ter the Enforcement Conference.

During the Enforcement

Conference, please be prepared to address the following:

Safety significance of these matters;

--

'

Root cause evaluations;

--

1

Factors that worsened or mitigated these matters;

--

Broader implications of these matters, and;

--

Actions to prevent recurrence.

--

.

Your cooperation with us is appreciated.

Sincerely,

l

Original Siged By-

'

l

l-

William F. Kane, Director

y

Division of Reactor Projects

OFFICIAL RECORD COPY CIR CC 89-31/89-32 - 0001.0.0

01/03/90

x

9001120139 900103

M

g

,

PDR

ADOCK 05000317

O

PNV

---

.

.

l'

..

Baltimore Gas and Electric Company

2

i

Enclosure:

NRC Region I Conbined Special Inspection Report Nos. 50-317/89-31 and

50-318/89-32

cc w/ enc 1:

W. Lippold, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

J. Lemons, Manager, Nuclear Outage Management

L. Russell, Manager, Calvert Cliffs Nuclear Power Plant

J, Walter, Engineering Division, Public Service Commission of Maryland

P. Birnie, Maryland Safe Energy Coalition

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

State of Maryland (2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

W. Russell, RA

T. Martin, ORA

D. Holody, EO

W. Kane, DRP

J. Wiggins, DRP

J. Linville, DRP

C. Cowgill, DRP

D. Limroth, DRP

K. Lathrop, DRP

K. Abraham, PA0

M. Miller, SLO

J. McGrath, SAO

J. Dyer, EDO

J. Lieberman, OE

M.'Callahan, OCA

L. Chandler, OGC

J. Partlow, NRR

R. Capra, NRR

S. McNeil, NRR

l

l

l

RI:DftP

RI:DR

RI:DRP

v

11/mjd

.

.roth

Wiggins

a.e

il/3 /90

1/$/90

1/3/90

1/ 3 /90

0FFICIAL RECORD COPY CIR CC 89-31/89-32 - 0002.0.0

01/03/90

l

,