ML20005E484

From kanterella
Jump to navigation Jump to search
Notifies That Listed Operating Conditions Acceptable & Will Ensure Reliability of 115 Kv Offsite Power Source,Per Util Stating That Operational Min of 100% Nominal Voltage Placed on Offsite Power Source
ML20005E484
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/21/1989
From: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9001050321
Download: ML20005E484 (2)


Text

o yo sogige.r un ti.cirie a c.. c:mp nr oils.treaym

,g Nuclear 0;*w.a gngngvgse m65 m

WCY7 a 9; ;3 Mr. S. D. Ebneter L

Regional Administrator

'U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N. W.

p Atlanta, Georgia 30323

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 115 KV Offsite Power Operations

Dear Mr. Ebneter:

SouthCarolinaElectric&GasCompany(SCE&G)inaletterdatedDecember7, 1989, stated that an operational minimum of 100% of nominal voltage would be placed on the 115 KV Offsite Power Source. This limit was to be utilized until further stability and/or load flow studies verified other conditions were acceptable. The Systems Planning group has verified, by performing a new grid stability analysis, that the following operating conditions are acceptable and will ensure the reliability of the 115 KV Offsite Power Source:

1)

With both 115 KV/7.2 KV Transformers in service to one Engineered Safety Features (ESF) bus, the minimum allowed voltage is 97.85% of nominal.

2)

With both 115 KV/7.2 KV Transformers in service to both ESF buses, the minimum allowed voltage is 98.98% of nominal.

3)

With only one 115 KV/7.2 KV Transformer in service to one ESF bus, the minimum allowed voltage is 98.88% of nominal.

1 If there are any questions, please contact me at your convenience.

1 1

Very truly yours,

[

k="

0. S. Bradham WRH/058:1cd c:

See Page 2 9001050321 091221

{DR ADOCK 05000395 PNV rief U-

r

,,y l

.y l-Mr. S. D. Ebneter December 21, 1989 j

Page 2 of 2

.c:

D. A. Nauman/0. W. Dixon, Jr./T. C. Nichols, Jr.

j E. C. Roberts i

W. A. Williams, Jr.

I J. J. Hayes, Jr.

General Managers C. A. Price

)

l R. B. Clary 1

l';

J. R. Proper K. E. Nodland J. C. Snelson R. L. Prevatte J. B. Knotts, Jr.

I NPCF-i NSRC RTS (ONO890061)

File (818.05) r i

i l

r i

f i

1 l-

.