Advises That Util 890331 & 0630 Responses to NRC Bulletin 88-010 & Suppl 1 to Bulletin Confirmed That Activities Required to Address Substandard molded-case Circuit Breakers Will Be Performed on Acceptable Schedule.Issue Complete
ML20005D594
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/09/1989
From: Fairtile M
Office of Nuclear Reactor Regulation
To: Wessman R
Office of Nuclear Reactor Regulation
Shared Package
ML20005C816 List:
References
FOIA-89-404 IEB-88-010, IEB-88-10, TAC-71369, NUDOCS 8908140274
Download: ML20005D594 (1)


Text

,

g M y' Docket No. 50-271 Pf

[-

7 J

K

{

i 4

[

1 b

MEMORANDUMFOR:[RichardH.Wessman, Director

! Project Directorate I i

_{DivisionofReactorProjectsI/II, FROM:

Norton B. Fairtile, Project Manager Project Directorate 1-3

Division of Reactor Projects I/II,

SUBJECT:

  • VERMONT YANKEE NUCLEAR POWER CORPORATIO CONFIRMATION OF ITS tRESPONSE TO NRC BULLETIN 88-10 AND SUPP EMENT 1 TO BULLETIN
88-10(TACKO.71369)

By letters ~ dated March 31 and June 30, 1989, Vermont Yan.ee responded to

- Bulletin 8810. ( As a result of Supplement 1 to Bulletin 88-10, corrections to their March'31,;1989 submittal were not recuired.

In it responses, the

' licensee confirmed that activities requiret to address t.e issue of substandard molded case circuit br(akers discussed in Bu letin 88-10 have been performed or. will be )erformed on an acceptable schedule A detailed technical review of tie licensee's responses has not bee performed; however, the area may be subject to inspection at a later date, f a subsequent inspection identifies' deficiencies in the licensee's act ons and responses, t

this issue will be reopened. Presently we consider this ction complete.

By copy of'this memorandum, Region I is advised of the 1 censee's position on this matter.

. Original signed h:

Morton B. Fairtile, P'oject Manager Project Directorate 143 Division of Reactor P)ojectsI/II Office of Nuclear Reahter Regulaticn cc:

R. Blough, Region I G. Grant, Resident Inspector TAC 71369 DISTRIBUTION "im0ocketaEHa~

PD1-3 Reading MRushbrook

%[\\/b MFairtMe JStone PD -

P PD1-S D:PD

DESP

(

MRus o

MFairtile:rw RWessman

'3/9/89 O / 9/89 g/89 Y

81402 90609 1f k

5

" C,05000271

k. #

\\)

. l w 3 :+.,

.. L L '&_.l--- bl'Yv'h.bA&:l

! b k '%NNf; W % h.-

D

- ecember 13, 1988'

MEMORANDUM FOR:. Edward L. Jordan, Chairman Consnittee to Review Generic Requirements y'

' FROM:

James H. Snierek, Deputy Director,

Office of Nuclear Reactor Regulation

SUBJECT:

ADVANCED NOTICE OF PROPOSED RULEMAKING " ACCEPTANCE

-0F PRODUCTS PURCHASED FOR USE IN NUCLEAR POWER'

. PLANT STRUCTURES, SYSTEMS AND COMPONENIS"

.The Office of Nuclear Reactor Regulation requests that the Conraittee to Peview U

Generic' Requirements (CRGR) consider the enclosed proposed Advance Notice of-

-Proposed Rulemaking (ANPR).

Recent experience has shown that some products-purchased for use in nuclear power plant structures, systems.and components are substandard, have falsified records or are otherwise misrepresented.

The ANFR solicits public coninent on a list of -issues related to the procurement of products for use at nuclear power plants. The issues are posed in the form of questions. This is done to elicit comments that may suggest the appropriate regulatory course.of action. This is the action necessery to enhance the prob.

t_

ability that structures, systems and components installed in nuclear power plants will perform as expected.

The performance expectation is'that the products will perform their intended safety functions or that they will perform c the normal functions in a manner which will avoid challenges to the plant safety systems.

Enclosed is the proposed ANPR and the information required to support the issuance-of the ANPR.

The staf f will brief the CRGR on the ANPR on fraudulent materials. Brian K. Grimes Director of Reactor Inspection and Safeguards, is the spunsoring Division Director.

Original Signed By Jack W. Roe for James H. Sniezek, Deputy Director Office of Nuclear Reactor Regulation

Enclosure:

Proposed ANPR CONTACT:

E. William Brach, NRR (301)492-0961 Distribution:

TMurley

-JSniezek FKiraglia BGrimes MClausen BBrach DRIS R/F iFC -

lA:DRIS:NPA
D:

ISrNRR

ADT: 1R
DD:h k
MJClausen: @ :lf f (m.........:....

es

FJM r aglic
JHkiezekb....:..............:..........

AME

.iATE. :12/lk/88

12//L /88
12/I N 88
12/@88 I

ki 5 tweic y