Forwards IE Insp Repts 50-416/81-12 & 50-417/81-07 on 810428-0501.No Noncompliance Noted
ML20005B554
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/29/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20005B555 List:
References
NUDOCS 8107080364
Download: ML20005B554 (2)


See also: IR 05000416/1981012

Text

{{#Wiki_filter:I .

= ma sto

o UNITED STATES ' []),,fgf NUCLEAR REGULATORY COMMISSION . c i "j/ .. g ,, D '/ s REGION 11 o'

  1. #

101 M ARIETTA ST.. N.W., SulTE 3100

  • t'd

ATLANTA. G EoRGIA 30303 " " " MAY 2 91981 . 6Me /b g Mississippi Power and Light Company 7/ b ,f O q $ @ # '!2- ATTN: N. L. Stampley 9 1 lit Q\\ "[%Lg g #g Vice President of Production ' P. O. Box 1640 Jackson, MS 39205 g. f /7g v{{ Gentlemen: Subject: Report Nos. 50-416/81-12 and 50-417/81-07 This refers to the routine safety audit conducted by Mr. R. Wright of this office on April 28 - May 1, 1981 of the cuality assurance program for design, procure- ment, and construction of the Grand Gulf facility, and to the discussion of our preliminary findings held with Mr. Y. W. Yelverton of your staff at the conclu- sion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative recorcs, interviews with personnel, and observations by the inspectors. Within the scope of this inspection, no violations or deviations were disclosed. We have examined actions you have taken with regard to previously identified - enforcement matters. These are discussed in the enclosed inspection report. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspec- tion report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhcid such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you within the specified period, the report will be placed in the Public Document Room. 3W .s // hEUSEx"o!$88% PDR

' MAY 2 9 Is8I . . , Mississippi Power and Light Company 2 Should you have any questions concernir.g this letter, we will be glad to discuss tnem with you. Sincerely, N. C. R. C. I _w i s , Ac:1ng Director Division of Resident and Reactor Pro.iect Inspection Enclosure: Inspection Report Nos. 50-016/81-12 and 50-417/81-07 cc w/ encl: C. K. McCoy, Plant Manager . I 1 l l t ( l l }}