ML20005B536
| ML20005B536 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/15/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20005B537 | List: |
| References | |
| NUDOCS 8107080344 | |
| Download: ML20005B536 (2) | |
See also: IR 05000413/1981011
Text
'
..
.
/pn etcg
.
Do,
UNITED STATES
i > , ,. ,f %
NUCt. EAR REGULATORY COMMISSION
I -
" J' // 5
REGION 11
k
[
101 MARIETTA ST., N.W.. su!TE 3100
- [/
%
ATLANTA. GEORGIA 30303
"***'
. p. , p .g
ATTN: Mr. W. O. Parker. Jr.
- .N /Q,p
Duke Power Company
@
N
Vice President. Steani Production
f (-
AN
P. O. Box 2178
-
r
Charlotte, NC 28242
\\)
2
..
- p [ gfh
Gentlemen:
3\\
c
Subject: Report Nos. 50-413/81-11 and 50-414/81-11
V
.
6
This refers to the routine safety inscection conducted b
-
anDocrn of
this office on April 26
May 25, 1931, of activities authorized by NRC
-
Construction Permit Nos.
PPR-116 and CPPR-117 for the Catawba facility and to
the discussion of our findings held with Mr. D. G. Beam, Project Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative record , interviews with
personnel, and observations by the inspector.
Within :ne scoce of this inspection, no violatior s or deviations were cisclos d.
.
4
We have exarr;ned actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. ~ These items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe' to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
'
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full rotatement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure.
This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
26o/
a
fj B1070GO344 810615
/ '!
~
I
i
tl}PDR ADOCK 05000413
klG
i
- -
- -
-
-
- .
.
.
- -
-
-
._
_- _
_
_.
. . ~ . __
. _ . . - - _ _ _ _
. _ _
..
_.
-
3
. .
4
.
.
9
'
l
Duke Power Company
2
UWlf"U
'
!
4
.{
sougnt to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
,
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
!
Sincergly,
_
,
f'/
j
,i
,
kh's L
JL Kelloom b m[ q( [C5tif -
'
/
,i,.
Div'iif oii of Rysident and
/
Reactor Project Inspection
i
Enclosure:
Inspection Report Nos. 50-413/81-11
and 50-414/81-11
!
l
cc w/ encl:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
'
i
4
t
!
,
$
4
9
l
.
--,vw,
,,y--
g.,m ye ve m y-
,,-,.v--=..g.w,
n,..,
,,y.-
yee
7,.g----,ew---#,m-.,e-%-my--
h v ,,, y e wym ,y3
w w w ,,,- c .% % ,.g.4,w .e
,*,.e gg .,ww. w e,.w
,
-.e-w=w-wn.-**