ML20005B536

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/81-11 & 50-414/81-11 on 810426-0525.No Noncompliance Noted
ML20005B536
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/15/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20005B537 List:
References
NUDOCS 8107080344
Download: ML20005B536 (2)


See also: IR 05000413/1981011

Text

'

..

.

/pn etcg

.

Do,

UNITED STATES

i > , ,. ,f %

NUCt. EAR REGULATORY COMMISSION

I -

" J' // 5

REGION 11

k

[

101 MARIETTA ST., N.W.. su!TE 3100

[/

%

ATLANTA. GEORGIA 30303

"***'

. p. , p .g

ATTN: Mr. W. O. Parker. Jr.

- .N /Q,p

Duke Power Company

@

N

Vice President. Steani Production

f (-

AN

P. O. Box 2178

-

r

Charlotte, NC 28242

\\)

2

..

  1. p [ gfh

Gentlemen:

3\\

c

Subject: Report Nos. 50-413/81-11 and 50-414/81-11

V

.

6

This refers to the routine safety inscection conducted b

-

anDocrn of

this office on April 26

May 25, 1931, of activities authorized by NRC

-

Construction Permit Nos.

PPR-116 and CPPR-117 for the Catawba facility and to

the discussion of our findings held with Mr. D. G. Beam, Project Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative record , interviews with

personnel, and observations by the inspector.

Within :ne scoce of this inspection, no violatior s or deviations were cisclos d.

.

4

We have exarr;ned actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. ~ These items will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe' to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

'

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full rotatement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

26o/

a

fj B1070GO344 810615

/ '!

~

I

i

tl}PDR ADOCK 05000413

klG

PDR

i

- -

- -

-

-

- .

.

.

- -

-

-

._

_- _

_

_.

. . ~ . __

. _ . . - - _ _ _ _

. _ _

..

_.

-

3

. .

4

.

.

9

'

l

Duke Power Company

2

UWlf"U

'

!

4

.{

sougnt to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

,

i

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

!

Sincergly,

_

,

f'/

j

,i

,

kh's L

JL Kelloom b m[ q( [C5tif -

'

/

,i,.

Div'iif oii of Rysident and

/

Reactor Project Inspection

i

Enclosure:

Inspection Report Nos. 50-413/81-11

and 50-414/81-11

!

l

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager

'

i

4

t

!

,

$

4

9

l

.

--,vw,

,,y--

g.,m ye ve m y-

,,-,.v--=..g.w,

n,..,

,,y.-

yee

7,.g----,ew---#,m-.,e-%-my--

h v ,,, y e wym ,y3

w w w ,,,- c .% % ,.g.4,w .e

,*,.e gg .,ww. w e,.w

,

-.e-w=w-wn.-**