ML20005B480
| ML20005B480 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/05/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20005B481 | List: |
| References | |
| NUDOCS 8107080280 | |
| Download: ML20005B480 (2) | |
See also: IR 05000321/1981015
Text
_ _ -
-___
--.
--_
,
7
.
.
,
/
UNITED STATES
o
P
NUCLEAR REGULATORY COMMISSl")N
~
o
l!
E
REGION 11
101 MARIETTA ST
N.W.. SUITE 3100
ATLANTA, GEORGIA 30303
-
ouN 0 51981
. . -
. - - -
Qfh}
Georgia Power Company
C'
1
ATTN: Mr. J. H. Miller, Jr.
C hL
h
Executive Vice President
et
q19B F C
270 Peachtree Street
8 Q
Atlanta, GA 30303
.3
Gentlemen:
'
&, ;,l
/
Subjact: Report Nos. 50-321/81-15 ana 50-366/81M5 Q' [M.
This refers to the routine safety inspection conducted by Mr. R. F. Rogers of
this office on April 21 - May 20, 1981, of activities authorized by NRC Operating
License Nos. OPR-57 and NPF-5 for the Hatch facility and to the discussion of our
findings held with Mr. M. Manry, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Witnin these areas, the inspection consisted of
selective examir.ations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Withir. the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to th's office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld ' from public
disclosure.
This section further requires the statement to addre,s with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
~56ol
s
,
l
//
fi107000200 810605 ,
%PDR ADOCK 05000321'
dO
-
- _ - _ _ _ _ - .
.'
.
.
JUN 0 51981
Georgia Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
f. C .
R. C. ' ewis, Acting Director
Division of Resident and
Reactor Project Ir.spection
Enclosure:
Inspection Report Nos. 50-321/81-15
and 50-366/81-15
cc w/ encl:
W. A. Widner, Vice President and
General Manager-Nuclear Generation
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
,