Forwards IE Insp Repts 50-321/81-15 & 50-366/81-15 on 810421-0520.No Noncompliance Noted
ML20005B480
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/05/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20005B481 List:
References
NUDOCS 8107080280
Download: ML20005B480 (2)


See also: IR 05000321/1981015

Text

_ _ -

-___

--.

--_

,

7

.

.

,

/

UNITED STATES

o

P

NUCLEAR REGULATORY COMMISSl")N

~

o

l!

E

REGION 11

101 MARIETTA ST

N.W.. SUITE 3100

ATLANTA, GEORGIA 30303

-

ouN 0 51981

. . -

. - - -

Qfh}

Georgia Power Company

C'

1

ATTN: Mr. J. H. Miller, Jr.

C hL

h

Executive Vice President

et

q19B F C

270 Peachtree Street

8 Q

Atlanta, GA 30303

.3

Gentlemen:

'

&, ;,l

/

Subjact: Report Nos. 50-321/81-15 ana 50-366/81M5 Q' [M.

This refers to the routine safety inspection conducted by Mr. R. F. Rogers of

this office on April 21 - May 20, 1981, of activities authorized by NRC Operating

License Nos. OPR-57 and NPF-5 for the Hatch facility and to the discussion of our

findings held with Mr. M. Manry, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Witnin these areas, the inspection consisted of

selective examir.ations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Withir. the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to th's office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld ' from public

disclosure.

This section further requires the statement to addre,s with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room.

~56ol

s

,

l

//

fi107000200 810605 ,

%PDR ADOCK 05000321'

dO

PDR

-

- _ - _ _ _ _ - .

.'

.

.

JUN 0 51981

Georgia Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

f. C .

R. C. ' ewis, Acting Director

Division of Resident and

Reactor Project Ir.spection

Enclosure:

Inspection Report Nos. 50-321/81-15

and 50-366/81-15

cc w/ encl:

W. A. Widner, Vice President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

,