Advises That Licensee Will Submit Response to NUREG-0313, Revision 1,requirements by 811001,including Plans & Schedule for Replacement of Nonconforming Matls,Per 810226 Generic Ltr 81-03
ML20005B472
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/30/1981
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0313, RTR-NUREG-313, TASK-A-42, TASK-OR GL-81-03, GL-81-3, NUDOCS 8107080270
Download: ML20005B472 (2)


Text

a PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 1881 1981 PHILADELPHI A. PA.19101

~

SHIELDS L. DALTROFF u=1,=:L O

JUL 0 7 ISBN -

M.n v.a. W "*n'^*' h owwme

\\Q June 30, 1981 Tuf' h/

Docket Nos. 50-277 50-278 Mr. Darrel G.

Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

Your letter of February 26, 1981, (Generic Letter 81-04) forwarded the final NUREG 0313, Rev.

1,

" Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping", which provides the NRC staff's acceptable methods for reducing intergranular stress corrosion cracking.

Your letter requested that we review our pressure boundary piping and safe ends to determine if they meet the guidelines of NUREG 0313, Rev.

1, and identify any materials thst do not meet these guidelines.

Augmented inservice inspection requirements are to be incorporated into our Technical Specifications for material that does not meet the NUREG guidelines.

Our review of the items requested in your letter with respect to Peach Bottom Atomic Power Station Units 2 and 3 continues at this time.

We are evaluating weld stresses to determine the extent of our augmented inservice inspection program for pressure bounuary pipi.g and safe ends.

The current Unit 3 refueling outage at Peach Bottom involves several modifications that directly affect our response to NUREG 0313, Rev.

1.

Planned modifications include core spray, reactor water cleanup and residual heat removal head spray pipe material changeu and removal of the recirculation system bypass line.

However, due to outage sche'ule changes the status of some of these modifications is uncertain.

p0(

[iPDR ADOCK 8107080270 810630 05000277

$l D t

)

dP PDR

9 Mr. D.'G.

Eisenhut Page 2 Based on the status of our work at this time and the uncertainty of modifications presently in progress, we propose to submit our complete response to the requirements of NUREG 0313, Rev. 1, by October 1, 1981, including our plans and schedule for replacement of nonconforming materials.

Our October 1,

1981, submittal is not expected to impact our ability to perform appropriate augmented inservice inspection during the Unit 2 refueling outage scheduled to begin in January, 1982.

If you have any questions or require additional information, please don't hesitate to contact us.