ML20005B033
| ML20005B033 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 06/17/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20005B034 | List: |
| References | |
| NUDOCS 8107060245 | |
| Download: ML20005B033 (2) | |
See also: IR 05000461/1981008
Text
r
/h8J/8)
.
.
.
r
.
DUN f 7 gggg
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. H. H. Livermore
of this office on April 1 through May 1, 1981, of activities at the Clinton
Power Station, Unit 1, authorized by NRC Construction Permit No. CPPR-137 and
to the discussion of our findings with Mr. M. C. Hollon and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examinati:;n of procedures and representative records, observations, and
interv ews with personnel.
During this inspection, certain of your activities appeared to be in non -
compliance with NRC requirements, as specified in enclosed Appendix A.
A written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will be
- _
placed in the NRC's Public Document Room.
If the enclosures contain any
'
information that you or your contractors believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
~
your intention to file a request for withholding; and (b) submit within
twenty-five (25) days from the date of this letter a written application
to this office to withhold such information. Section 2.790(b)(1) requires
that any such application must be accompanied by an affidavit executed by
l
the owner of the information which identifies the document or part sought
l
to be withheld, and which contains a full statement of the reasons on the
basis which it is claimed that the information should be withheld from
!
!
i
5 t{t
8107060245 010617
PDR ADOCK 0500061
O
PjR
.
-
.
.
.
Illinois Power Company
-2-
,
public disclosure. This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4). The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, a copy of this letter,
the enclosures, and your responsa to this letter will be placed in the
Public Document Room.
We will -
ily discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Acting Director
Division of Resident and Project
Inspection
Enclosure:
IE Inspection
Report No. 50-461/81-08
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Hary Jo Murray, Office of
Assistant Attorney General
Gary N. Wright, Deputy
Director
Mr. Randell L. Plant, Prairie
Alliance
+
l
i
i
'
i
!
RII
RIII
RII
RIII .,
-W(flr.. 7
- .ff/
RcK
Live rmore/jp
Reimahn
Knop
He hman ,
6/11/81
(
'