Forwards IE Insp Repts 50-206/81-17 on 810423-0508.No Noncompliance Noted
ML20005A809
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/12/1981
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20005A810 List:
References
NUDOCS 8107010295
Download: ML20005A809 (2)


See also: IR 05000206/1981017

Text

[%g

o

UNITED STATES

gt

g

y

.e,(

j

NUCLEAR REGULATORY COMMISSION

.

g;

s

REGION V

1990 N. CALIFORNIA BOULEVARD

e

j

SUITE 202, WALNUT CREEK PLAZA

g * ,, , a ,e

WALNUT CREEK, CALIFORNIA 94596

June 12, 1981

Docket No. 50-206

t'A l.'D'

c>s

N ' C,[1 *h9

'

Southern California Edison Company

P. O. Box 800

<D

'

6[r P,{JL

2244 Walnut Grove Avenue,

/

7

Rosemead, California 91770

c

-i

JUN 3 01981 e i

~

b .aia.eusmaa4 toss M

Attention: Dr. L. T. Papay, Vice President

u

""

D

Advanced Engineering

/

Gentlemen:

4

ta

Subject:

NRC Investigation - San Onofre Unit 1

This refers to the investigation conducted by Messrs 0. Shackleton, P.

Joukoff, and G. Yuhas of this office oh April 23 through May 8,1981, of

activities authorized by NRC License No. DPR-13, and to the discussion

of our findings held by Mr. Yuhas with Mr. J. M. Cwran and other members

of your staff on April 30, 1981.

Areas examined during this investigation are described in the enclosed

investigation report. Within these areas, the investigation consisted

of selective examinations of procedures and representative records,

interviews with personnel, and observations by the investigators.

No items of noncompliance with NRC requirements were identified within

l

the scope of this investigation. Our examination of your system to

control release of radioactively contaminated tools and other materials

from restricted areas, however, revealed that the system failed to

provide for a full accounting of the release of such items.

In view of

the findings of our investigation which substantiated that hand tools

and other materials had been removed from the facility site and the

!

l

results of our previous inspections (Report Nos. 50-206/81-02and81-11)

'

wherein we found that low level radioactive material had been removed

l

inadvertently from the restricted area, we are concerned with the

l

effectiveness of your program to preclude the release of potentially

radioactive material from the restricted area. Accordingly, we believe

this matter requires your attention. We will continue to review this

l,

matter in future NRC inspections.

s. j

  • "

Q

.

.

..

.

.

-2-

June 12, 1981

In accordance with 10 CFR 2.790 of the Commission's regulation, a copy

of this letter and the enclosed investigation report will be placed in

the NRC's Public Document Room. If this report.contains any infomation

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within 25

days from the date of this letter a written application to this office

to withhold such infomation.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the oyner of the infomation which identifies

the document or part sought to be withheld, and which contains a full

statement of the basis which it is claimed that the infomation should

be withheld from public disclosure.

This section further requires the

statement to address with specificity the considerations listed in 10 CFR 2.790 (b) (4).

The infomation sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.~ If we do not hear from

-~

you in this regard within the specified periods noted above, the report

will be placed in the Public Document Room.

Should you have any questions concerning this investigation, we will be

glad to discuss them with you.

.

.

,

Sincerely,

i2CE

I

R. H. Engelf

7 Director

l

Enclosure:

'

Investigation Report

,

50-205/81-17

i

l

cc w/o enclosure:

l

R. Dietch, Vice President

Nuclear Engineering & Operations, SCE

,

J. M. Curran, Plant Manager, San Onofre

!

San Clemente, CA.

l

.

,

W