05000324/LER-1981-028-01, /01T-0:on 810610,while Performing Orderly Unit Shutdown,Shutdown Period Was Exceeded by 12 Minutes.Caused by Personnel Error.Personnel Reinstructed on Importance of Following Action Statements

From kanterella
(Redirected from ML20005A613)
Jump to navigation Jump to search
/01T-0:on 810610,while Performing Orderly Unit Shutdown,Shutdown Period Was Exceeded by 12 Minutes.Caused by Personnel Error.Personnel Reinstructed on Importance of Following Action Statements
ML20005A613
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/22/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20005A600 List:
References
LER-81-028-01T, LER-81-28-1T, NUDOCS 8106300496
Download: ML20005A613 (1)


LER-1981-028, /01T-0:on 810610,while Performing Orderly Unit Shutdown,Shutdown Period Was Exceeded by 12 Minutes.Caused by Personnel Error.Personnel Reinstructed on Importance of Following Action Statements
Event date:
Report date:
3241981028R01 - NRC Website

text

m U.ru LICENSEE EVENT REPORT

~CObin!L 8 LOCK:

l l

l l

l lh (PLEASE PRINT CR TYPE ALL REOU12ED INFORMATION)

~

6 loj LJ l N l C l P l E l P l 2 l@l 0 l 0 l-l 0 l 0 l g l 0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l1 l@l l

l@

7 8 9 LICENSEE CODE I4 15 LICENSt NUMUEH lb 26 LICEN5E TYPE Ju 51 LA T bd CON'T l,,o_j_j sohRC QMl 0 l 5 l 0 l - l 0 l 3 l 2 l 4 @l 0 l 6 l 1 l 0 l 8 l 1 l@l0 16 l 2 l 2 l 8 l1 l@

i 8

60 61 DOCKET NUMBER 68 69 LVENT DATE 14 75 REPORT DATE do EVENT DESCPIPTION AND PROGABLE CONSEQUENCES h l_lLhile nerrormine an orderly unit shutdown. required due to the trin of 2A Reactor l

o 2 ITTil l Recirculation Pump, reported in.LER 2-81-52, it was determined that the shutdown had 1

l not been completed within the required 12-hour period. The period was exceeded by i

o 4 ITITl I 12 minutes. This event did not affect the health or safety of the public.

l ITT l l i

ITTil I I

Iolal 1 Technical Specification 6.9.1.8b l

80 7

89 DE CODE CUSCO E COMPONENT CODE SU8 COD'E S

E 1o191 I cl al@ l, A_jh l A lh l Zl Zl Zl Zl Zl Zlh [Zjh [Zj h 7 -

9 to il 12 IJ IS 19 20 SEoVE NTI AL OCCURRENCE REFoRT REVISION Lgg to EVENTYEAR REPORT NO.

CODE TYPE NO.

h atg]

l8 l1 l

(---J l O! 2l 8l l/l l 0l1 l lTl

[.--j l 0l gu 21 22 2J 24 26 27 28 29 JO 31 32 lXl@[Zj@

(_Z_J@

lZl@

l 0l 0l 0l 0l lN l@

lY l@. $ PPLIE MAN FACTURER AKEt ACT ON ON PL NT TH HOUR $

S8 IT FOR b ti.

lZ l@

lZl9l9]9l@

33 J4 35 J6 31 40 el 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h l During the shutdown, equipment problems affecting reactor vessel level and conducti-1 i o Iil_iJ l vity were encountered which diverted the operator's attention from the snutdown and I

l therefore he did not complete it in a timely manner. The involved personnel were l

i 2 g l counselled to stress the importance of timely adherence to required action statements.]

i 4 l All licensed personnel will review this LER to ensure their awareness and under-l so 1

8 standing of this concern.

,y 0

STATUS

'6 POWER OTHER STATUS DISCOVERY DISCOVERY OESCniPTION [YITl l Glh l 0l 0 l 0l@l NA l

l A l@l Operator Surveillance l

il 44 45 46 80 ACTIVITY CO TENT AMoVNT o, ACTiviTv @ l LoCAT,oNo,REu,sE@

nEuAsEn cPRiuAsE i

I Lzj @ I ZI@l N^

' o i

8 9 10 il 44 45 30 PERSONNEL EXPOSURES NUURE R TYPE

DESCRIPTION

> 10 l n l 01@l Z l@l NA j

i P Rio~NEL,NJu'4Es ao oEsCRiPTio~@

~uM8 R NA l

l0l0l0lhl t H Jtg F -e P00R ORlGlNAL 1

7 8 9 to 80 NRC USE ONLY DE SCliaPTION ISSUEftLN_ hl NA l

lllllllll[lllj 2 a 7

8 9 to 68 69 80 S i

(919) 457-9521 2

M. J. Pastva, Jr.

PHONE:

NAMt of PREPAnER 81oesooy96