ML20005A421

From kanterella
Jump to navigation Jump to search
Forwards LER 80-040/01T-0.Detailed Event Analysis Encl
Date released: 01/19/2020 Download: ML20005A421


LER 80-040/01T-0:on 801226,removable Instrument Assembly 40 Count Rate Increased,Apparently Due to Leak in once-through Steam Generator Tube.Caused by High Cycle Fatigue.Tube Replaced.Leak Procedure Implemented
ML20005A424
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/10/1981
From: Jackie Jones
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A424 (1)
Forwards LER 80-040/01T-0.Detailed Event Analysis Encl
ML20005A420
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/10/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20005A420 (3)