Fifth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported on 800415. Util Reinspecting Welds Per Sampling Techniques of MIL-Std 105D.Next Rept by 810728
ML20005A300
Person / Time
Site: Bellefonte Tennessee Valley Authority icon.png
Issue date: 06/23/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NCR-1173, NUDOCS 8106300170
Download: ML20005A300 (2)


Text

-

9> - #

a

.R~{b.& ~

,/2((

'7 400 Chestnut Street Tower II 4'

t y

June 23, 1981 T\\

9 d

2 4

Mr. James P.

'Reilly, Director

'S Office of Ins ion and Enforoament U.S. Nuclear Re tory Co W asion Region II - Suite 00 101 Marietta Street Atlanta, Georgia 303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNIT 2 - )EI. DING CF STRUCTURAL STEEL ANNULUS FLOOR FRAMING - NCR 1173 - FIFrH IlffERIM REPORT The subject nonconformance was initially reported to NRC-OIE Inspector R. W. Wright an April 15, 1980 in accordance with 10 CFR 50.55(e). This was followed by our interia mports dated May 15, July 30, and November 7, 1980 and February 20, 1981. - Enclosed is our fifth interim mport. We expect to submit our next witten report by July 28, 1981.

If you have any questions concernin6 this matter, please get in touch with D. L. Lambert at FIS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure oct Mr. Victor Stallo, Jr., Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ren s

lll l

S P00R BRIGINAL

4 r,..

in ENCLOSURE BELLEFONTE NUCLEAR PLANT UtiIT WELDING OF STRUCTURAL STEEL ANNULUS FLOOR FRAMING-NCR 1173 10 CFR 50.55(e)

FIFTH INTERIM REPORT Description of Deficiency The welding inspector' completed visual inspection records - for welds of structural steel annulus. floor framing before the welds had been made.

' fnterim Progress TVA has finalized its record search to identify inspections for which the welding inspector was responsible. The initial sample space for reinspection of the welds has been determined per the sampling techniques

. of MIL-Standard 105D. TVA is in the process of reinspecting these welds.

e D

1 4

(

W A