3
__y O
4 "" "'"%
,,,,, e,..,,,
[h.,_ f., $
NUOLEAR REUULkhb.ECOMM!SE!ON WASWNGTON. D. C. 20555 j..m p [y 3
(
?8 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONi FOR l
WISCONSIN ELECTRIC POWER COMPANY POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 1
DOCKET NOS. 50-266 AND 50-301_
INTRODUCTION i
the Three Mile Island Nuclear Power Plant, Unit 2 (TMI-2)
On March 28, 1979 experienced core damage which resulted from a series of events which were initiated by a loss of feedwater. transient. Several aspects of the acci-On dent have generic applicability at operating Westinghouse reactors.
April 11, 1979, IE Bulletin 79-06 was sent to all Combustion Engineering and Westinghouse operating plant licensees. The purpose of the Bulletin was to provide information concerning the accident at TMI-2 and to request certain actions be taken by licensees to preclude a similar occurrence at their facilities. This bulletin was superseded and expanded by IE Bulletin 14, 1979, and by IE Bulletin 79-06A Revision 1 dated April 79-06A dated April 18, 1979. By letters dated Apri' 19, April 27, August 23, September 20 and September 26, 1979 Wisconsin Electric Power Company provided responses in conformance with the requirements of the Bulletins.
EVALUATION In the two year period since the Bulletin (s) have been implemented we have observed, in addition to our review of the responses enumerated above, that the licensee has complied with all the following provisions cf the Bulletins:
- Understanding of the TMI-2 sequence of events.
- Review Plant Procedures for coping with accidents and transients.
- By review of procedures and training instructions:
(1) to avoid overriding automatic action of ESF, (2) to keep high pressure injection (HPI) system in operation for at least 20 minutes and to maintain 50 F subcooling margin, (3) to correlate HPI initiation with reactor. coolant pump (RCP) opera-tion, and (4) to train operators not to rely on pressurizer level only, to deter-mine primary coolant inventory.
- Verification of emergency feedwater (EFW) valve positions and all safety-related valve positions to ensure proper operation of EFW and ESF.
Bl og OD G9
- By review of containment isolation initiation and design for avoidance of isolating lines that are needed to avoid degraded core cooling capability.
By preparing and implementing procedures for all valves which could defeat or compromise f1',d of EFW. '
By reviewing operating modes hnd procedures to prevent inadvertent pumping of radioactive gasses and liquids out of the primary containment.
By reviewing procedures related to maintenance and test of safety-related systems to:
(1) verify operability of redundant system prior to removal of any system -
from service, (2) verify operability of all systems following maintenance or testing, and (3) verification to operating personnel whenever a system is removed from or returned to service.
By developing procedures and training operators to establish and maintain natural circulation.
By training operators to take into account reactor vessel integri.ty con-siderations during any accident or transient.
By performing analyses and design modifications to reduce the likelihood of automatic PORY actuation during anticipated transients.
By providing procedures and training operators for a prompt manual reactor trip for transients that result in a pressure increase in the reactor coolant system.,
By providing for prompt reporting within one hour of the time the reactor is not in a controlled or expected condition of operation.
By proposing any needed Technical Specification changes to implement any of the above parts of the Bulletins.
CONCLUSIONS Based on our review of the information provided by the licensee in response to IE Bulletins79-06A and 79-06A Revision 1, we conclude that the licensee has acceptably responded to these Bulletins. The actions taken by the licensee demonstrate its understanding of the conccrns and implications of the TMI-2 accident as they relate to the Point Beach Nuclear Plant, Units 1 and 2.
These actions have resulted in added assurance for the continued protection of the public health and safety during plant operation.
Dated: JUN I 7 IS61 1