Text
e m
y#
UNITED STATES
%,'i
[*
NUCt. EAR REGULATORY COMMISSION REGloN IV g
k^b, N 'f
$11 RYAN PLAZA DRIVE. SulTE *0C0 ARUNGToN, TEXAS 76011
!/.*J 0 4 g,
MEMORANDUM FOR: Those Listed Below FROM:
G. L. Madsen, Chief, Reactor Projects Branch, RIV
SUBJECT:
IE INFORMATION NOTICE NO. 81-04 Subject IE Infomation Notice has been sent to the following licensees. A copy is attached for your infomation.
Arkansas Power & Light Company ANO-1 & 2 (50-313, 50-368)
Nebraska Public Power District Cooper Nuclear Station (50-298)
Omaha Public Power nistrict Ft. Calhoun Nucl u r Station (50-285)
Public Service Company of Colorado Fort St. Vrain (50-267)
&lfifgh & '
'G. L. 4.adsen, Chief Reactor Projects Branch
Attachment:
As stated DISTRIBUTION:
IE FILES MPA/DTS CENTRAL FILES
\\ P f r6N
<rri A
S gg,1-<
.K G
?
MJ g g
R P P. 0 3 1g g g n =
E k T. w,a
-r... i4,1:
3.
8106220 msg R
SSINS No.: 6835 Accession No.:
8011040265 UNITED STATES NUCLEAR REGULATORY CCMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
'4ASHINGTON, D.C. 20555 IE Information Noticc 'lo. 31-04 February 27, 1981 Page 1 of 2 CRACKING IN MAIN STEAM LINES Descriotion of Circumstances:
The Virginia Electric Power Company promotly notified the NRC on Feoruary 23, 1981 that a radiography examination, during the ongoing steam generator replacement outage at Surry Unit 1, had revealed a lengthy crack indication in tne I.O. countercore area of a welcment on the in-line "T" fitting which connects the vertical run of 30-inch piping to the safety relief valve header and 30-inch main steam line of Steam Generator "A."
This piping ccnnection is located outside the containment penetration f aneciately uostream of the main steam isolation valve as shown in the attached sketch.
A visual and dye penetrant examination on the pipe I.D. surface of the weldment nearest the containment penetration established that the cracking extended about 120 F around the fitting counterbore between the 4 o' clock to 3 o' clock position.
Cracking was also observed in the weld countercore at the opposite end of the T-fitting during visual examination of the piping interior.
Radio-
. wmc examination of "3" and "C" main steam line T-fitting welds disclosed crack indications at similar locations.
Metallurgical specimens of the cracking were trepanned from the T-fitting of the "A" main steam line for analysis.
Controllec excavation and deptn measurements of the crack at its mid-length indicated a crack depta of about 0.090" in this location.
The cause of cracking has not yet been established.
VEPCO has planned an ultrasonic examination of similar welcments in surry Unit 2 main steam lines utilizing " Hot Piping" ultrasonic tecnnicues.
Precarations are also being mace to ultrasonic examine similar welcments at North Anna Unit 1, currently in cold snutcown for refueling.
Recommencation to Licensees:
$de 44mtion is crovided as an early notification of a significant safety g? 5 t 9/ 7 m : '
7;,
or possible acclicacility to Oneir
~
- NRC staff.
It is exoected tnat m
.-x gf',
main steam line configurations wnica h
DUPLICATE DOCUMENT t recair outage, it is rec:mmenced I'
- amination of :ne tnree welcs anc f"
Entire document previously
- erformec aefore rescotion of p
entered into system under:
3r assurance of oicing integrity 30ll N o Q 7 ANo No. of paces:
//