ML20004F787
| ML20004F787 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/26/1981 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20004F783 | List: |
| References | |
| NUDOCS 8106220365 | |
| Download: ML20004F787 (2) | |
See also: IR 05000327/1980043
Text
,.
.
/
UNITED STATES
/'
%'t,
NUCLEAR REGULATORY COMMISSION
d'
E
REGION li
k
101 MA8'lETTA ST., N.W.. SUITE 3100
l
AT LANTA, G EORGI A 30303
.....
JAN 2 61981
'
Tennessee Valley Authority
ATTN:
H. G. Parris
,
Manager of Power
500A Chestnut Street Tower II
.
Chattanooga, TN 37401
Gentlemen:
Subject: Report Nos. 50-327/80-43 and 50-328/80-21
'
This refers to the routine inspection conducted by C. Julian of this office on
November 2-6, 1980, of activities authorized by NRC Operating License No. DPR-77
and Construction Permit No. CPPR-73 for the Sequoyah I and 2 facility. Our
preliminary findings were discussed with J. Ballentine at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activi*.ies under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
Problems similar to those identified in the Notice of Violation were discussed
in an enforcement conference with L. M. Mills and other TVA staff members on
November 19, 1980. During this meeting, TVA representatives described detailed
actions taken or planned to *.nprove the effectiveness of your management control
systems. The results of these corrective actions will be examined during subse-
quent inspections.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
rgort will be placed in the NRC Public Document Room. If this report contains
ary information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such infor-
mation from public disclosure. Any such application must include the basis for
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
,
you in this regard within the specified period, the report will be placed in the
Public Document Room.
,
8106220 3 Q
.
.
.
.
.
'
--
.
.
.4
~
JAN 2 61991
Tennessee Valley Authority
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
. them with you.-
Sincerely,
,
_.. g.o R.10 o
ames P. O'Reilly
,_
' rector
I
Enclosures:
1.
Appendix A, Notice of Viola
2.
Inspection Report Nos.
50-327/80-43 and 50-328/80-21
.
cc w/ enc 1:
3
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
'
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff