ML20004F609

From kanterella
Jump to navigation Jump to search
Responds to NRC 810429 Ltr Re Violations Noted in IE Insp Repts 50-508/81-07 & 50-509/81-07.Corrective Actions: Fishbach & Moore Contractor Initiated Qualification of Welding Procedure on 810331
ML20004F609
Person / Time
Site: Satsop
Issue date: 05/26/1981
From: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20004F607 List:
References
GO3-81-2046, NUDOCS 8106190200
Download: ML20004F609 (5)


Text

'

P P W shington Public Power Supply System A JOINT OPERATING AGENCY S

P O. 8031223 (LMA, W ASHINCTON 98541 PHONE (2%)149 5001 May 26,1981 G03-81-2046 Nuclear Regulatory Commission, Region V $

Suite 202, Walnut Creek Plaza 1990 North California Boulevard h' y 52[O ' '

Walnut Creek, California 94596 ISS; s Attention: Mr. B. H. Faulkencerry b Chief, Reactor Construction Projects 3 ranch .

9 Gentlemen:

Subject:

PROJECT NOS. 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 00CKET NUMBERS 50-508 AND 50-509

References:

1) Letter, B. H. Faulkenberry to R. S. Leddick, same subject, dated April 29, 1981.
2) Federal Register Notice (45 FR 66754, dated -

October 7,1980). ..

This letter is\n response to your letter of April 29, 1981 which discussed the results of the inspection conducted March 2 to 27,1981 of activities authorized by the Nuclear Regulatory Connission Construction Permit Numbers CPPR-154 and CPPR-155. The letter identified one item of non- -

compliance categorized iry accordance with Reference 2 and required the Supply System te provide a response to the iten.

The specific Nuclear Regulatory Commission finding, as stated in your letter, and the Supply System response are provided in Attachment I to this letter.

Should you have any questions or desire further info-mation, please feel free to contact me directly.

Very truly yours, R. S. Leddick Program Director, WNP-3/5 Attachments cc: D. Smithpeter - BPA Ebasco - New York WNP-3/5 Files - Richland

.s106190'bO*iW BI-64

Nuclear Regulatory Ccmmission-Finding 10CFR 50,' Appendix B, Criterion IX states in part: " Measures shall be established to assure that special processes, including welding, . . .

are controlled and accomplished . . . using qualified procedures in accor-dance with applicable codes, standards, specifications, criteria, and other special requirements."

Paragraph 17.4.9 of the Quality Assurance Program documented in the PSAR states in part: "

. . . Special procedures prepared by site contractors will be qualified when required in accordance with applicable codes and standards . . ."

The electrical installation contract specification (No. 3240-225/253) spe-cifies that electrical cable tray support welding shall be accomplished in accordance with the AWS Structural Welding Code DI.I. The Structural Weld-ing Code states that procedures must be qualified unless certain requirements are met. Among these requirements is that fillet welds must meet minimum size requirements for various base metal thicknesses. For example, for base metals thicker than 3/4 inch the minimum fillet weld size is 5/16 inch. The electrical cable tray support drawings (e.g., Dwg. No. SS-27 for supports E-162 through E-165) ' designate 3/16 inch fillet welds for base material thicknesses of 1.26 inches. In additian, approved Field Change Request No. FCR-F-1017 of January 14, 1981, for Contract No. 3240-225/253 specifies that the con-tractor's fillet weld procedure must be qualified.

Contrary to the above, as of March 26, 1981, the contractor had not qualified his fillet welding procedure, yet had used this procedure for the welding of all safety-related cable tray supports.

This is a Severity Level V Violation (Supplement II), applicable to Unit 3 only.

l

, c. ,

v

  • Nuclear Regulatory Comission-Finding Corrective Steps Which Have Been Taken:
1. When notified of the item of noncompliance, Fischbach & Moore (F&M)

Inc., 3240-225/253 contractor, had previously stopped welding Class I seismic supports as a result of F&M Stop Work Order (SWO) 002.

F&MSWO002wasissuddMarch 13, 1981, for reasons other than weld-ing. Subsequently, the Stop Work corrective action allowed for re-lease of material for fabrication and installation. All welding on supports released for fabrication was performed to qualified welding procedures.

2. To preclude use of unqualified multiple pass fillet welds during in-stallation, F&M IOM, A. N. McLeod to J. A. Wiley, dated April 22, 1981, prohibited the use of all multiple pa:: welds until a procedure was qualified.
3. F&M 104, A. N. McLeod to J. A. Wiley, dated April 27, 1981, rescinded the 10ft in Item 2 and clarified use of multiple pass welds to those covered by Table 2.7 of AWSDl.l.
4. Upon completion of F&M's investigation of multiple pass welds performed prior to notification of the noncompliance, F&M issued NCR 225-3036 on April 28, 1981. This NCR is presently being evaluated by Ebasco.

Corrective Steos Which Have Been Taken To Avoid Further Violation:

1. On fisrch 31, 1981, F&M initiated qualification of welding procedure AWS-1A. The welding process and record was incorporated into CP-403S3, j l

Revision 4, " Welding of Steel Structures," on April 1,1981. I i l l-

2. On April 21, 1981, F&M roted that AW'i-1A was not qualified in accor-i dance with code requirements and necessitated requalification of the l procedure. Between April 1 - April 21, no unqualified welds were per-formed.

.. , :D e; , , . - * '

t

3. On April 28,1981, F8M requalified welding procedure AWS-1A and incor-Jporated this record in Revision 5 of CP-403S3, on May 1,1981.

Date-When Full ~ Compliance Will Be Achieved:

CP-40353, Revision 5, was approved on May 8,1981. . Training of F&M per-sonnel and craft will be accomplished by June 1,.1981.

4

-c A

i i -

4 i

4 0

t R. S. LEDDICK, Being first duly sworn, deposes and'says: That he is the Program Director, WNP-3/5, for the WASHINGT0t! PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the fore-going on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED Matt 2.G , 1981.

J R. S. LEDDICK STATE OF WASHINGTON ) -

) ss COUNTY OF GRAYS HARBOR )

On this day personally appeared before me [t. S. LEDDICK to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and pur-poses therein mentioned.

GIVEN under my hand and seal this dloO day of S t4 , 1981. -

1

. 1 Notary Public in'and for the State of Washington Residing at Rrvut _

_ - - . . _ . - .- -