ML20004F591

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info by 810626 Re Containment Spray Sys Section of Fsar.If Date Cannot Be Met,Requests Notice within 7 Days of Plans to Submit Response
ML20004F591
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/12/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Byran J
UNION ELECTRIC CO.
References
NUDOCS 8106190174
Download: ML20004F591 (3)


Text

,..

I DISTRIBUTION WJohnstof

. m mo "*'

OELD I

LBel Rag OIE (3)

OYoungblood WHouston JUN 121981 ADromerick AChu GEdison KDempsey MRushbrook bcc: TERA s

Docket Nos.: 'STN 50-482 s RVollmer PDR

~

and STN 50-483 TMurley LPDR RMa ttson NSIC RHartffeld, MPA TIC

' Mr. John K. Bryan

. Mr. Glenn L. Koester ACRS (16)

Vice President Vice President - Nuclear Union Electric Company Kansas, Gas and Electric Company # s

1901 Gratiot Street 201 North Market Street

\\

Post Office Box 149 Post Office Box 208

/.

D,

'~~

d m;2 j$b t St. Louis, Missouri 63166 Wichita, Kansas 67201 A

Q 6 jggI A,

Dear Gentlemen:

-1 % (% g% %

Subject:

SNUPPS FSAR - Request for Additional Information -

Q q

Containment Spray System a

s As a result of our review of your. application for operating licenses we fin that we need additional information regarding.the SNUPPS FSAR. The specific information required is as a result of our review of the containment spray i

system and is listed in the Enclosure.

To maintain our licensing review schedule for the SNUPPS FSAR, we will need responses to the enclosed request by June 26,.1981.

If you cannot meet this date, please inform us within seven days after receipt of this letter of the date you plan to submit your, resconses so that we may review our schedule for any necessary changes.

Please contact Mr. Dromerick, SNUPPS Licensi:1g Project Manager, if you desire any discussion or clarification of the enclosed request.

Sincerely, JAMES R. MILLER /s/ FOR Robert L. Tedesco, Assistant Director for Licensing Division of Licensing 2ncLst.e:

As sined

c: See next page 8 m mrn A

_c P00R OP&NE

-- Cl;,bB4l, DL:L3dl DL:LBM.

DL;AD/L j

a[ro'matick/lgGEdison BJYoungblood RLTedesco l

. > 6'/10/81 6/ /81 6/ /81 6/ /81

n..

7 : x ;; _.: 5 :_: :

3,:~

r--

g

7.,-

Mr. J. K. Bryan Mr. Glenn L. Koester

.Vice President - Nuclear

.Vice President - Nuclear Union Electric Company Kansas Gas and Electric Company.

P. O. Box 149 201 North Market Street St. Louis, Missouri 63166 P. O. Box 208 cc: Gerald Charnoff, Esq.

.Shaw, Pittman, Potts -

Dr. Vern Starks Trowbridge & Madden Rotte 1, Box 863 1800 M. Street, N. W.

Ketchikan, Alaska 99901 Washington, D. C.

20036 Mr. William Hansen Kansas City Power & Light Company.

U. S. Nuclear Regulatory Commission ATTN: Mr. D. T. McPhee Resident Inspectors Office.

Vice President - Production RR #1 1330 Baltimore Avenue Steedman, Missouri 65077 Kansas City, Missouri. 64101

~

Ms. Treva Hearn, Assistant General Counsel ~

Mr. Nicholas A. Petrick Missouri-Public Service Commission Executive Director, SN'JPPS P. 0.. Box 360 5 Choke Cherry Road Jefferson City, Missouri 65102 Rockville, Maryland 20850 Jay Silberg, Esquire Mr..J. E. Birk Shaw, Pittman, Potts & Trowbridge Assistant to the General Counsel 1800 M Street, N. W.

Union Electric Company Washington, D. C.

20036 St. Louis, Missouri 63166 Mr. D. F. Schne?1 Kansans for Sensible Energy Manager - Nuclear Engineering P. O. Box-3192 Union Electric Company Wichita, Kansas 67201 P. O. Box 149 St. Louis, Missouri 63166 Francis Blaufuse Westphalia, Kansas 66093 Ms. Mary Ellen Salava Route 1, Box 56 Mr. Tom Vandel Burlington, Kansas 66839 Resident Inspector / Wolf Creek NPS c/o USNRC Mr. L. F. Orbi P. O. Box 1407 Missouri - Kansas Section Emporia, Kansas 66801 American Nuclear Society 15114 Navaho Mr. Michael C. Keener Olathe, Kansas 66062 Wolf Creek Project Director State Corporation Commission Ms. Wanda Christy

- State of Kansas 515 N. 1st Street Fourth Floor, State Office Building Burlington, Kansas 66839 Topeka, Kansas 66612 Floyd Mathews, Esq.

Birch,.Horton, Bittner & Monroe 1140 Connecticut Avenue, N. W.

Washington, D. C.

20036 e

V gj

  • e Y b z -

}

i,

' REQUEST--FOR ADDITIONAL INFORMATION tr SNUPPS FSAR-

  • f 20 450iOJ 3 ACCIDENT EVALUATION.
Q 450.10. lThe -SNUPPS' FSAR indicates that the mode of initiation of'switchover

~

-(6.5:2)-

(RSP)E ofithe_containmentspraysystem. suction'fromth'eRefuelingWater

~ I Storage' Tank tol the containment' sump is l manual..The sta'ff_ finds that this practice departs from that currently deemed acceptable'. SRP

'Section 6.5.2 (II.. Acceptance Criteria, item 2.a) states.L"The conta'in-

~

ment spray system should be designed...~ and should be capable of-continuous operation.thereafter until the design objectives of the system have been achieved.

In all cases tne operating ceriod should not be less than two; hours." Manual initiation of the switchover does not' guarantee continuous operation for two hours and does not crovide assurance that the d' esign objectives of.the spray system are achieved for delayed fission croduct releases frcm the core.

It is the.

staff's position that we require a design modification which wili t

' change from manual to automatic the switchover of the containment-spray system from the RWST to the containment sumo.

State your. intent regarding compliance with our position.

,e L

k E

.- -.,.. J