Responds to NRC Re Violations Noted in IE Insp Rept 70-2895/81-01.Corrective Actions:Conducted Daily Survey of Licensed Matl & Personnel Assigned to Perform Wipe Surveys First Wk of Each Month
ML20004F533
Person / Time
Site: 07002895
Issue date: 03/13/1981
From: Van Dien E
SPECTRO-CHEM LABORATORIES, INC.
To: Kinneman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20004F532 List:
References
NUDOCS 8106190031
Download: ML20004F533 (2)


Text

m sb i

,. _ A 'J

^~

[#['

8

/// L A B O R AT O R I E S I N C.

545 COMMERCE STREET, f'R A N K LIN LAKES, N E V/ J E R S E Y o 7417 e PHONE (201) 8918787 (201) 337 4774 p-L)

March 13, 1981 Mr. John D. Minneman, Chief Materials Radiological Protection Section Nuclear Regulatory Commission Region'I 631 Park Avenue King of Prussia, Pennsylvania 19405 Inspection 70-02895/81-01 Re:

Docket No. 70-02895

Dear Mr. Minneman:

Corrective steps for violations and procedures for Ir(suring future compliance were instituted upon receipt of notice of violation. To insure future compliance we have made the technical director directly responsible and accountable for com-pliance with the procedures outlined in the license.

In addition, administrative control has been instituted to insure that required activities are carried out and that adequate records kept and routinely audited.

Specific actions are described below for each violation.

A.

Violation I - Survey o f work area.

(l) Corrective steps:

After each day's work with licenced materials a quallfled Individual surveys the work area.

(2) Corrective steps - future:

A separate record is maintained which contains:

Day sample received, disposition, dates and techniques of analyses, technicians who handle the material, and meter survey results for each day that material is handled.

Entries are Initiated by opeatives aid records audited by the director weekly.

(3) Date of full compliance:

February 26, 1981 Violation II - kbnthly swipes (1) Corrective steps:

Work areas were surveyed February 26, 1981 and have been found to comply.

(2) Corrective steps - future:

Personnel have been designated to condt.ct swipe surveys the first week of each month.

Dates and names of technicians performing swipes will be recorded in the quality control notebook Arrangements are being instituted with Teledyne-Isotopes for evaluation. The.echnical director will supervise these activities and the administrative director will audit records monthly.

19 0 %L Continued........

C O *d T R O L. ' A N A L Y S 4 S

  • QVALiTATIVE EXAMINATION
  • RESEARCH. CONSULTATION I

t

i l

,; '-o [

W y.._

0;

/8

  • 8 8/M L A B O R A T O'R 1 E S 1 N C.

545 COMMERCE STREET. F R AN K LIN L AKES. 'NEW JERSEY 07417 e PHONE (201) 891-8787 (201) 337 4774 page 2

- (3) Date of full compl'.ance:

May 1, 1981 0 Usa of'lleensed materlat by non-licensed personnel 7

(1) Corrective steps:

All personnel have been Instructed about the requirements for handling licensed material. Processing of materials is now carried out under the direct supervistcn of licensed personnel. The technical director is responsible over. all for ccepliance.

(2) Corrective steps - future:

Two additional personnel will undergo the necessary training at Teledyne-Isotopes and wlil ba added to the license. Administrative control has been established to insurs that adequate records are kept.

Very truly yours, SpectroChem Laboratories, Inc.

M E. 1. Van Dien Secretary-Treasurer EIVD:aw i