ENCLOSURES TRAN" TTED HERENITH

g

CONTAIN 10 CF.

790 INFORMATION

.

8 , g % ga

UMTED STATES

+

NUCLEAR REGULATORY COMMISSION

8 , ".r,

. E

REGION I

t 4,illlh [!

83) ' ARK AVENUE

/

-

e(m '

KING OF PRUSSid, PENNSYLVANIA 19406

[

\\'

f%g

V\\

'\\<

!

Docket No. 50-293

01 JUN G81 R

f b

F'

L~

r %

'

Boston Edison Company M/C Nuclear

  1. ,

-

N)

$'

ATTN:

Mr. A. V. Morisi

f

Nuclear Operations Support Manager

S00 Soylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection 50-293/81-07

This refers to the routine safety inspection conducted by J. Joh'nsen of this

office on March 2 - 16, 23 - 31, 1981 of activities authorized by NRC License

No. OPR-35 and to the discussions of our findings neld by Mr. Johnson with Mr.

.

C. Mathis and other members of your staff periodically during the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

  • Based on the results of this inspection, it appears that certain of your activities

were not concucted in full compliance with NRC requirements, as set forth in the

Notices of Violation, enclosed herewith as Appendices A and 8. These items of

noncompliance have been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are recuired to respond

to this letter and in preparing your response, you should folicw the instructions

-

in Appendices A and B.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosures will be placed in the NRC's Puolic Occument Rocm.

If

this report contair.s any information that you (or your contractors) believe to

be exempt frem disclosure under 10 CFR 9.5(a)(4), it is necessary tnat you (a)

notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

within 25 days from the date of this letter a written application to this office

to withhold such information.

Consistent with section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons on the basis which it is claimed

that the information should be withheld from public disclosure.

This section

further requires the statement to address with specificity tne censiderations

listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we do

not hear frca you in this regard within the specified pericds noted above, the

TGol

Z

Q

ENCLOSURES TRANSMITTED HERENfrH

/ I

-

8106I60/67

c0NTAIN 10 CFR 2.7S0 INFORMATiON

, --

ENCLOSURES TRA SMITTED HEREWITH

CONTAIN 10

2.790 INFORMATION

  • s

Boston Edison Company M/C Nuclear

2

01 JU.'l G2T

report will be placed in the Public Document Room.

The telephone notification

of your intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, documentation of findings of your control

and accounting procedures for safeguarding special nuclear mr:erials and your

facility security measures for physical protection are deemeu to be commercial

or financial .information within the meaning of 10 CFR 9.5(a)(4) and shall be

subject to disclosure only in accordance with the provisions of 10 CFR 9.12;

therefore, the pertinent section of the enclosed inspection report and Appendix

B, will not be placed in the Public Occument Room and will rece <e limited

4

distribution.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

-

ti

7

. Brunner, Chief, Projects

Brarjch #1, Division of Resident

.

and Project Inspection

Enclosures:

1.

Office of Inspection and Enforcement Inspection

--

Report Number 50-293/81-07

2.

Appendix A, Notice of Violation

l

3.

Appendix B, Notice of Violation *

(w/o Appendix B & Pages 5 and 6 of Rpt)

cc:

R. O. Machon, Nuclear Operations Manager - Pilgrim Station

'

i

.

/

ENCLOSURES TRANSMITTED HEREWITH

CONTAIN 10 CFR 2.790 INFORMATION

'

.--