Text
'
nio
I&
o
UNITED ST ATES
g
j
[
g
NUCLEAR REGULATORY COMMISSION
'
O
j
REGION 1
Q
g
631 PARK AVENUE
'
KING OF PRUSSIA, PENNSYLVANIA 19404
g *****,d
,
Docket Nos. 50-245
APR 2 21981
%
,
g
Northeast Nuclear Energy Company
3N
,
p o,U 0q$[w ;S
t--
JO
ATTN: Mr. W. G. Couns11
-
A
Senior Vice President - Nuclear
Engineering and Operations
A
P.O. Box 270
.
%m
@Q
~
Hartford, Connecticut 06101
.
Gentlemen:
Subject:
Combined Inspection 50 245/81-01 and 50-336/81-01
This refers to the routine inspection conducted by Mr. J. Shediosky of this
office on January 1 through February 14, 1981 at the Millstone Nuclear Power
Station, Waterford, Connecticut, of activities authorized by NRC License
No . DPR-21 and DPR-65 and to the discussions of our findings held by
Mr. Shedlosky with Mr. Mroczka and other members of your staff periodically
during the inspection.
,
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
Our inspector also verified the steps you have taken to correct the item
of noncompliance brought to your attention in the enclosure to our letter dated
September 22, 1980. We have no further questions regarding your action at
this time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels described in the Federal Register
Notice (45 FR 66754) dated October 7,1980. This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10 Code of Federal Regulations. Although Section 2.201 requires
you to submit to this office, within 25 days of your receipt of this notice,
a written statement of explanation, we note tnat this item of noncompliance
was corrected prior to the completion of our inspection, and therefore, no
response with respect to this matter is required. You have documented your
actions taken to correct this item in your letter dated February 27, 1981.
81061203/d
h
.
.
.
.
. -
_
.
-.
_.
.
.
-.
.
.
.
-
Northeast Nuclear Energy Company
2
- R23 $
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the en-
closure will be placed in the NRC's Public Document Room.
If this report
contains any infona tion that y7u (or your contractor) believe to be pro-
prietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any
such application must be accompanied by an affidavit executed by the owner
of the information, which identifies the document or part sought to be
withheld, and which contains a statement of reasons which addresses with
specificity the items which will be considered by the Commission as listed
in subparagraph (b)(4) of Section 2.790
The information sought to be with-
held shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
period, the report will be placed in the Public Document Room.
No reply to this letter is required; however, should you have any questions
,
concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
._
~
,
E,
. Brunner, Chief
P jects Branch #1, Division of
Resident and Project Inspection
Enclosure: Office of Inspection and Enforcement Combined
Inspection Report Number 50-245/81-01 and
50-336/81-01
cc w/ encl:
J. F. Opeka, System Superintendent Nuclear Operations
E. J. Mrotzka, Station Superintendant
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
,
'