Forwards IE Insp Repts 50-327/81-14 & 50-328/81-14 on 810324-27 & Notice of Deviation
ML20004D861
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/28/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20004D857 List:
References
NUDOCS 8106100238
Download: ML20004D861 (2)


See also: IR 05000327/1981014

Text

to

.

'o

UNITED STATES

^ , ,

8

NUCLEAR REGULATORY COMMISSION

-

o

b

a

REGION 11

o

8

101 MARIETTA ST., N.W., SUlTE 3100

E

ATLANTA, GEORGIA 30303

o

'j

1

APR 2 81981

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. 50-327/81-14 and 50-328/81-14

This refers to the special inspection conducted by W. H. Miller, Jr. of this

office on March 24-27, 1981, of activities authorized by NRC Operating License

No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility.

Our

preliminary findings were discussed with J. M. Ballentine at the conclusion of

the inspection.

Areas examined during this inspection included fire protection / prevention.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and observa-

tions by the inspector.

Within the scope of this inspection, no violations were disclosed.

During the inspection it was found that certain activities under your license

appear to deviate from commitinant* to the Commission and have safety signifi-

cance. This item is identified in the Notice of Deviation enclosed herewith as

Appendix A.

Please provide us in writing your comments including a description

of correctiva actiane th:t have been or will be taken, corrective actions which

will be taken to avoid further deviations, and the date your corrective actions

will be completed.

We have uamined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

Four new unresolved items are identified in the enclosed inspection report.

These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and thu enclosed inspec-

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

810610 0W

e

--

-

.O

-

<

y

'

APR 2 81981

Tennessee Valley Authority

2

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

(..C.

C.

ewis, Acting Director

Divis on of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report Nos. 50-327/81-14

and 50-328/81-14

cc w/ enc 1-

H. J. Green, nivision Director

G. G. Stack. rroject Manager

J. M. Ballentine, Plant

,

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

.

-