i
~
f
' a * " ' %,,'o,
n
UNITED STATES
'
NUCLEAR REGULATORY COMMISSION
/
l
Y[U
EiYs'oY:
,
,
'.,, .
May 21, 1981
.
In Reply Refer To:
\\
%A'
RIV
Docket 50-382/Rpt. 81-12
'/
[
fk
-
LIA
)
9
"
p
JUN 0 3 ;ggy , I
$
.
,() "* Rgrow
Louisiana Power and Lignt Company
ATTN: Mr. D. L. Aswell
-
N Q'/h, 7y\\ \\
.<
T
Vice President Power Production
I
142 Delarende Street
.
New Orleans, Louisiana 70174
<1'
,
Gentlemen:
This refers to the inspection conducted by Messrs. A. R. Johnson and
D. P. Tomlinson of our staff during the period April 27 - May 1,1981,
of activities authorized by NRr. Construction Permit CPPR-103 for Waterford
Steam Electri "" ion, Unit 3, and to the discussion of our findings with
.
Mr. L. L. Bass o other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
,
selective examination of procedures and representative records, interviews
with personnel, and observations by tne inspectors.
Within the scope of the inspection, no violations or deviations were identi-
fied.
We have also examined your responses with regard to two previously identified
inspection findings. The status of these items is described in paragraph 2
of the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any infomation that you
believe to 5e exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone within 10 days from the date of
this letter of your intention to file a request for withholding; and (b) sub-
mit within 25 days from the date of this letter a written application to this
office to withhold such information.
If your receipt of this letter has been
delayed such that less than seven days are available for your review, please
notify this office promptly so that a new due date may be established.
-
Consistent with Section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the cwner of the information which identifies the
-
document or part sought to be withheld, and which contains a full statement of
8106090 M
Q
.
.
-
.
Louisiana Power and Light
Company
-2-
May 21. 1981
the reasons on the basis which it is claimed that the information should be
-
withheld from public disclosure. This section further requires the statement
.to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The infonnation sought to be withheld shall be incorporated as far as possible
.
into a separate part of the affidavit.
If we do not hear from you in this
'
regard within t".e specified periods noted above, the report will be placed in
,
the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
j
Sincerely,
,,
'[W. C. Seidle, Chief
Engineering Inspection Branch
Enclosure:
IE Inspection Report 50-382/81-12
.
.
6
O
i
,
. - -