[ff D DA/RYLAND
[k COOPERAT/VE PO BOX 817 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN $4601
.608) 788-4000 June 2, 1981 In reply, please refer uo LAC-7576 DOCKET NO. 50-409 Mr. James G. Keppler, Director U. S. Nuclear Regulatory Commission
\\
Directorate of Regulatory Operations Q\\
Ff Region III Y
{" ' h 799 Roosevelt Road Glen Ellyn, Illinois 60137 JUN O 81981
- E
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR) h PROVISIONAL OPERATING LICENSE NO. DPR-45 y,s _ -
REPORTABLE OCCURRENCE NO. 81-07
' cuy
References:
(1)
LACBWR Technical Specifications, Section 6.9.1.8.1 (2)
LACBWR Technical Specifications, Section 4.2.21
Dear Mr. Keppler:
In accordance with Reference (1), this report is notification of performance of a system that requires remedial action or corrective measures to prevent operation in a manner less conservative than assumed in Technical Specification bases.
l The bases for Reference (2) states that the Emergency Service Water l
Supply System is capable of supplying 900 gpm flow rate against a 50 psig reactor pressure.
The surveillance specification to demon-l strate this design criteria requires verifying that the combined pump l
output develops 900 gym at a minimum test pressure of 90 psig.
On June 1, 1981, with the plant in Operating Condition 4, the first I
integrated system test since the system was installed was conducted.
The pumps were capable of producing 870 gpm at 90 psig.
The required 900 gpm flow rate was achieved at a pressure of 82 psig.
The test i
pressure is measured at the pressure indicator located downstream of the Alternate Core Spray automatic isolation valves.
l Additional testing was conducted on June 2, 1981.
Individual pump l
Performance results indicaue that the required flow rate is attainable with minor system modifications.
Modifications and retesting will be l
accomplished prior to plant startup.
/)oo3 s N O MOO 8106090 470 g
7
Mr. James G. Keppler, Director LAC-7576 U. S. Nuclear Regulatory Commission June 2, 1981 Prompt notification of this event was made to Region III of the U. S. Nuclear Regulatory Commission by L. S. Goodman, LACBWR Operations Engineer, at 1315 on June 2, 1981.
If there are any questions concerning this report, please contact us.
Very truly yours, DAIRYLAND POWER COOPERATIVE
'd 2 L /
/ mb t-l V
Frank Linder, General Manager FL:LSG:af cc:
Director, Office of Management Information (2) and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 NRC Resident Inspectors --
-......