ML20004D199

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-254/81-09 & 50-265/81-09 on 810513.No Noncompliance Noted
ML20004D199
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/19/1981
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20004D200 List:
References
NUDOCS 8106080572
Download: ML20004D199 (2)


See also: IR 05000254/1981009

Text

b

o

UNITF81 STATES

~ , ,

8

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION lli

#

e

799 ROOSEVELT ROAD

o

GLEN ELLYN. ILLINOIS Go137

.....

May 19, 1981

c)

ID

&

M

0

,.

Docket No. 50-254

!-

Docket No. 50-265

5

MAY Y5 GM C

I u sin nsm M )

Commonwealth Edison Company

C"""**

(y, .

ATTN:

Mr. Cordell Reed

'

8

Vice President

g

Post Office Box 767

A

O

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

W. L. Axelson, W. B. Grant, and M. P. Phillips of this office on May 13,

1981, of activities at Quad-Cities Nuclear Generating Station, Units 1

and 2, authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30 and

to the discussion of our findings with Mr. N. Kalivianakis and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies the area examined

during the inspection. Within this area, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and intentiews with personnel.

No items of noncompliance with NRC requirements wen. identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

l

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

j

l

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

l

this letter a written application to this office to withhold such infor-

l

mation. Section 2.790(b)(1) requires that any such application must be

i

accompanied by an affidavit executed by the owner of the information which

'

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

8106080 9 7_,

.

,

Commonwealth Edison Company

-2-

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Rcom.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

o

J. A. Hind, Acting Director

Division of Emergency Preparedness

and Operational Support

Enclosure:

IE Inspection

Reports No. 50-254/81-09

and No. 50-265/81-09

cc w/encls:

J. S. Abel, Director

of Nuclear Licensing

N. Kalivianakis,

Plant Superintendent

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

Mary Jo Murray, Office of

Assistant Attorney General

l

l

!

_ _ _ _

_

.,

_

_