Forwards IE Insp Repts 50-369/81-11 & 50-370/81-04 on 810406-10.No Noncompliance Noted
ML20004D185
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/29/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20004D186 List:
References
NUDOCS 8106080549
Download: ML20004D185 (2)


See also: IR 05000369/1981011

Text

.

l

l

49

.

p

h,g

UNITED STATES

NUCLEAR REGULATORY COMMISSION

y

n

$ ,,

$

REGION ll

,#

e

101 MARIETTA ST., N.W., SulTE 3100

ATLANTA, GEORGIA 30303

o

APR 2 91981

[3'%g

  • "

<

fi.f

?

Duke Power Company

ATTN:

W. O. Parker, Jr.

/ ([

S

I-)

u,s%,9 444y$ 19

Y

Vice President, Steam Production

9

qg

P. O. Box 2178

Charlotte, NC 28242

i

~

Gentlemen:

/

Subject: Report No

a

9410/81-

G*

This refers to the routine safety inspection conducted by Mr. G. L. Trcup of

this office on April 6-10, 1981, of activities authorized by NRC License No.

NPF-9 and Construction Permit No. CPPR-84 for the McGuire facility and to the

discussion of our findings held with Mr. T. L. McConnell at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and obs' rvations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20 days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of whic5 it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

!

Sincerely,

'

E.c.

R. C.

ewis, Acting Director

i

Division of Resident and

l

Reactor Project Inaection

Enclosure: See Page 2

y106080

-

.

-

APR 291981

.

Duke Power Company

2

Enclosure:

Inspection Report Nos. 50-369/81-11

and 50-370/81-04

cc w/ enc 1:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

!

!