t.Y Q,
/,.... fo UNITED STATES
~ ~
N e
g
' ! ) 3.c. ?
g NUCLEAR REGULATORY COMMISSION
, e[}h{(
/
j
-i g g
.., e wAssiscron. o. c.20sss ME 1381
/
\\
'* [
g Doch,etNos.SU-317
=
~ h lb ][85 s.,,
. 4 A-1 E
d K 3. ((
f and'50-318 46 3.c
, 40
\\$
7w g
Mr. A. E. Lundvall, Jr.
ks Vice President - Supply Baltimore Gas & Electric Company P. O. Box 1475 Baltimore, Maryland 21203
Dear Mr. Lundvall:
6 The Commission is issuing the enclosed Supplement to the September 19, 1980 Safety Evaluation to document our review of your January 29, 1981 letter informing us of problems with the high-deasity borated spent fuel storage racks for the Calvert Cliffs Nuclear Power Plant, Units tio. I and 2.
In addition to your January 29, 1981 letter, these prcbices ucrc the subject.
of the NRC Off. ice of Inspection and Enforcement's " Notice of Violation" dated December. 11, 1980 and our meeting together in Beth6sda, Maryland en February 26, 1981.
We find the spent fuel storage racks designed by Nuclear Energy Services, Inc. and built by Metal Products of Greenville, South Carolina acceptable, as documented in the enclosure, for use at the Calvert Cliffs Plant. However, we believe the subject problems identify the following areas of concern where improvements are necessary in order to overcome shortcomings in your management and quality assurance control program.
Increased' understanding of Codes / Specifications to be used by potential e
suppliers'before purchase orders are issued; e Improved communications with the contracted supplier during the design phase of the work;
.s.h +..:g.fnci safe @ i$NolYemeVit in thE VevdYo'pment"$f'the 'suppNers kuali'ty'-J' N '
~
control program; e More competent review of submittals for NRC review; and e Improved inspection and test control procedures for suppliers and for final acceptance by Baltimore Gas and Electric Company.
o I
I 8106080
.. We.are aware that inprovements have been made in your management and
- quality assurance control programs, similar to some of the above suggestions, that will greatly reduce the possibility of similar problems occurring when the remaining spent fuel storage racks are designed, manufactured and installed at the Calvert Cliffs Plant.
By issuance of this letter, we consider this matter resolved.
Sincerely, U
p.v Robert A. Clark, Chief Operating Reactors Branch #3 Divisiot: of Licensing
Enclosures:
1.
Supplement to September 19 1980 Safety Evaluation.
2.
Summary of Meeting held on February 26, 1981 with BG&E in regards to Spent Fuel Storage Rack problems at CCNPP.
cc: See next page
- i?,._;s.',
- . * '~.,j. 6,*.; 6 3. '... ' ':& ??rb.%: u ;. :a:. S.-y,;j :,G(~ ' g.. = ~ d. R.\\.. i' r;;.. * *,: ", a.
4
/
~
n Baltimore Gas and Electric Company cc:
James A. Biddison, Jr.
Ms. Mary Harrison. President General Counsel Calvert County Board of County Commissioners Baltimore Gas and Electric Company Prince Frederick, MD 20768 P. O. Box 1475 Baltimo're, MD 21203 U. S. Environmental Protection Agency Region III Office George F. Trowbridge, Esquire Attn:
EIS Coordinator Shaw, Pittman, Potts and Trowbridge Curtis Building (Sixth Floor) 1800 M Street, N. W.
Sixth and Walnut Streets Washington, D. C.
20036 Philadelphia, PA 19106 Mr. R. C. L. Olson, Principal Engineer Mr. Ralph E. Architzel Nuclear Licensing Analysis Unit Resident Reactor Inspector Baltimore Gas and Electric Company NRC Inspection and Enforcement Room 922 - G&E Building P. O. Bos 437 P. O. Box 1475 Lusby, MD 20657 Baltimore, MD 21203 Mr. Charles B. Brinkman Manager - Washington Nuclear O'perations Mr. Leon B. Russell Plant Superintendent Combustion Engineering, Inc.
Calvert Cliffs Nucledar Power Plant ~.
4S53 Cordell Avenue, Suite A-1 Maryland Routes 2 & 4 Bethesda, MD 20014 Lusby, MD 20657 Mr. J. A. Tierman, Manager Bechtel Power Corporation Nuclear Power Department Attn: Mr. J. C. Judd Calvert Cliffs Nuclear Power Plant -
Chief Nuclear Engineer Maryland Routes 2 & 4 15740 Shady Grove Road Lusby, MD 20657 Gaithersburg, MD 20760 Director, C.titoria and Standards Division Combustion Engineering, Inc.
Of fice of Radiation Programs ( ANR-460)
Attn:
Mr. P. W. Kruse, itanager U. S. Environmental Protection Agency Engineering Services Washington, D. C.
20460 P. O. Box 500 Windsor, CT 05095 Mr. W. J. Lippold, Supervisor Nuclear Fuel Management
- *. Aiblic'Documen't Room' 4 Y
' % 3 4 r: Balt'imoFe ' Gas'.and Electric. Company)D' '.":j,,
i Calvert ;ounty Library Calvert Cliffs Nuclear Power Plant Prince Frederick, MD 20678 P. O. Box 1475 Baltimore, Maryland 21203 Director, Department of State Planning 301 West Preston Street Mr. R. E. Denton, General Supervisor Saltimore, MD 21201 Training & Technical Services Calvert Cliffs Nuclear Power Plant Mr. :!. M. Douglass, Manager Maryland Routes 2 & '4 Quality Assurance Department..
Lusby, MD 20657 Fort Smallwood Road Complex P. O. Box 1475 Baltimore, ftD 21203 t'.r. T. L. Syndor, General Supervisor Administrator, Power Plant Siting Program Operations Quality Assu ance Energy and Coastal Zone Administration