Forwards IE Insp Rept 50-293/81-05 on 810224-25.No Noncompliance Noted
ML20004C916
Person / Time
Site: Pilgrim
Issue date: 05/14/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML20004C917 List:
References
NUDOCS 8106080037
Download: ML20004C916 (2)


See also: IR 05000293/1981005

Text

NC. -

ameu

A

UNITED STATES

g

}

NUCLEAR REGULATORY COMMISSION

g

REGION 1

D

j

631 PARK AVENUE

C

&

%

,o'

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket No. 50-293

MAY 141981

P

%

a

Boston Edison Company M/C Nuclear

q

f

clarbpra

ns Support Manager

E

t

g Jun 0 g ggge$

8']0 Boylston Street

-

%

Boston, Massachusetts 02199

b

u,k

Gentlemen:

Subject:

Investigation No. 50-293/81-05

g

QT\\

This refers to the investigation conducted by Messrs. R. K. Christopher and R.

A. Matakas of this office on February 24-25, 1981, at Pilgrim Nuclear Power

Station, Plymouth, Massar.nusetts of activities authorized by NRC License No.

OPR-35 and to the discussions of our findings held by Mr. R. K. Christopher

with Mr. R. Machon of your staff at the conclusion of the investigation.

Areas examined during this investigation are described in the Office of Inspection

and Enforcement Investigation Report which is enclosed with this letter,

Within the rcupe of this investigation no items of noncompliance were observed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed investigation report will placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within 25 days from the date of this letter a

written application to this office to withhold su:h information.

Consistent

with section 2.790(b)(1), any such application must be acccmpanied by an

affidavit executed by the owner of the infarmation which identifies the document

or part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be withheld

from public disclosure.

This section further requires the statement to address

with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room. The telephone notification of your intent to request withholding, or

any request for an extension of the 10 day period whicii you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

8106080 O M

..

.

.

-

-

=

.

.

.

.

Boston Edison Company M/C Nuclear 2

,

No reply to ; is letter is required; however, should you have any questions

concerning this investigation, we will be pleased to-discuss them with you.

'

Sincerely,

b_

Robert T. Carlson, Director

Enforcement and Investigation Staff

Enclosure: Office of Investigation and Enforcement

'

Inspection Report No. 50-293/81-05

cc w/encls:

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

.

i

i

I

,

l

l

l

.

r

l

l

.

- - ,

s-w

.m- - - -g-

.*--g-y.f-m-w-,-

=-----.9-..m

y-py

,p+-s'w-9a.i-----

-.wW%4my

,m--,9-+y-,

.e

m

-%,-4

,%-+.w-tw

g

--g-----y.

g

7m,ne-#

.m.

p-e

w

9,ap

-_y

,

%

.~ .,

-+r---------w-