Forwards IE Insp Rept 50-423/81-03 on 810212.No Noncompliance Noted
ML20004C712
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/06/1981
From: Snyder G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20004C713 List:
References
NUDOCS 8106040562
Download: ML20004C712 (2)


See also: IR 05000423/1981003

Text

-.

-

..,

of j'

YY

'

UNITE 3 STATES

ng

,

NUCLEAR CEGULATORY COMMisslON

[

es

REGION I

lj -

"

KIF3 OF PRUSSI A. PENN.,(LV ANI A 19404

. 431 PARK AVENUE

f,

U

  • (....

.

0 6 APR 1981

.

_

Docket No.-50-423:.

sn

D

Northeast N" clear Energy Company.

-ATTN: .Mr. W. G. Counsil

.

O

f

q\\

Senior Vice President - Nuclear

A

Engineering.and Operations

T

P. O. Box 270

(

JUli0 d1981 m.

e

Hartford, Connecticut. 06101

' w s. g g asv

2

W['

l

Gentlemen *

,

Subject:

'aspection Number 50-423/81-03

Muf\\

-

This refers to the routine safety inspection conducted by Ms. C. Sakenas of this

office on February 12, 1981 at Millstone Nuclear Power Station, Unit 3, Waterford,

~

Connecticut of activities authorized by NRC Licensa No. CPPR-113 and to the

discussions of our "indings held by Ms. Sakenas with Messrs. Hims, Toth, and

others of your staf/ at.the con:lusion of the inspection

'

Areas examined during this inspection are described in the Office of Inspection -

,

and Enforcement Inspection Report which.is enclosed with this letter.

Within

these areas, the. inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

.

inspector.

.

Within the scope of this inspection, no items of non-onpliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part.2, Title

[_

t

.10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

!

i

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

,

necessary that you make a written application within 20 days to this office to

.

withhold such information from public disclosure.

Any such application must be

'

accompanied by an affidavit executed by the owner of the information, which

f

s

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (.4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

!;

81'06.0406 d

Q

.

.

. .

.

.

. -

- - - -

.

.-- - --

.-

4 Y

? '

n

Northcast Nuclear Energy Company

2

0 6 APR 1961

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Si erely,

t

.

Ga

L. S der,

ief

Eme gency Prep

dness and

Program Support Branch

' Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-423/81-03

cc w/ encl:

K. W. Gray, Construction Quality Assurance i.ead

.

H. .R. Nims, Director of Nuclear Projects

,

J. F. Opeka, Station Superintendent

J. R. Hineelwright, Licensing Safeguards Engineer

D. G. Diedrick, Manager of Quality N surance

'

,

1.

l

l

- , -.

.

-

-

. - - . . .

,

. -

. . . - - l