ML20004C712
| ML20004C712 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/06/1981 |
| From: | Snyder G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20004C713 | List: |
| References | |
| NUDOCS 8106040562 | |
| Download: ML20004C712 (2) | |
See also: IR 05000423/1981003
Text
-.
-
..,
of j'
YY
'
UNITE 3 STATES
ng
,
NUCLEAR CEGULATORY COMMisslON
[
es
REGION I
lj -
"
KIF3 OF PRUSSI A. PENN.,(LV ANI A 19404
. 431 PARK AVENUE
f,
U
- (....
.
0 6 APR 1981
.
_
- Docket No.-50-423:.
sn
D
Northeast N" clear Energy Company.
-ATTN: .Mr. W. G. Counsil
.
O
f
q\\
Senior Vice President - Nuclear
A
Engineering.and Operations
T
P. O. Box 270
(
JUli0 d1981 m.
e
Hartford, Connecticut. 06101
' w s. g g asv
2
W['
l
Gentlemen *
,
Subject:
'aspection Number 50-423/81-03
Muf\\
-
This refers to the routine safety inspection conducted by Ms. C. Sakenas of this
office on February 12, 1981 at Millstone Nuclear Power Station, Unit 3, Waterford,
~
Connecticut of activities authorized by NRC Licensa No. CPPR-113 and to the
discussions of our "indings held by Ms. Sakenas with Messrs. Hims, Toth, and
others of your staf/ at.the con:lusion of the inspection
'
Areas examined during this inspection are described in the Office of Inspection -
,
and Enforcement Inspection Report which.is enclosed with this letter.
Within
these areas, the. inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
.
inspector.
.
Within the scope of this inspection, no items of non-onpliance were observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part.2, Title
[_
t
.10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
!
i
report will be placed in the NRC's Public Document Room.
If this report contains
any information that you (or your contractor) believe to be proprietary, it is
,
necessary that you make a written application within 20 days to this office to
.
withhold such information from public disclosure.
Any such application must be
'
accompanied by an affidavit executed by the owner of the information, which
f
s
identifies the document or part sought to be withheld, and which contains a
statement of reasons which addresses with specificity the items which will be
considered by the Commission as listed in subparagraph (b) (.4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
!;
81'06.0406 d
Q
.
.
. .
.
.
. -
- - - -
.
.-- - --
.-
4 Y
? '
n
Northcast Nuclear Energy Company
2
0 6 APR 1961
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Si erely,
t
.
Ga
L. S der,
ief
Eme gency Prep
dness and
Program Support Branch
' Enclosure:
Office of Inspection and Enforcement Inspection
Report Number 50-423/81-03
cc w/ encl:
K. W. Gray, Construction Quality Assurance i.ead
.
H. .R. Nims, Director of Nuclear Projects
,
J. F. Opeka, Station Superintendent
J. R. Hineelwright, Licensing Safeguards Engineer
D. G. Diedrick, Manager of Quality N surance
'
,
1.
l
l
- , -.
.
-
-
. - - . . .
,
. -
. . . - - l