ML20004C570

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-213/81-03 on 810301-0410 & Notice of Violation
ML20004C570
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/21/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20004C571 List:
References
NUDOCS 8106040287
Download: ML20004C570 (2)


See also: IR 05000213/1981003

Text

..

o

.

k

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

a

$

j

REGION I

g

e31 PARK AVENUE

.

%*****p#-

xame or PnusslA. PENNSYLVANIA 19408

Mkf ,

MAY 211981

-

Docket No. 50-213

S

/o

S

,

JU// g O

Connecticut Yankee Atomic Power Company

-i

-

/Sgg r--l

ATTN: Mr. W.G. Counsil

,-

u.4, k l g% %

Vice President - Nuclear Engineering

-//

'

and Operations

P.O. Box 270

4

p

Hartford, Connecticut 06101

g

,

Gentlemen:

Subject:

Inspection 50-213/81-03

This refers to the routine safety inspection conducted by Mr. T.H. Smith of

this office.on March 1 - April 10, 1981 at the.Haddam. Neck Plant,.Haddam,

Connecticut, of activities authorized by NRC License No. OPR-61 and to the

discussions of our findings held by Mr. T.H. Smith with Mr. R.H. Graves of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective examina-

tions.of procedures and representative records, interviews with personnel,

and observations by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of non-

compliance has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your response, you should follow the

instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of

this letter and the enclosures will be placed in the NRC s Public Document

Room.

If this report contains any information that you oryourcontractors)

believe to be exempt from disclosure under 10 CFR 9.5(a) 4), it is necessary

that you (a) notify this office by telephone within ten 10) days from the

date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from~the date of this letter a written application

to this office to withhold such information. Consistent with section 2.790

(b)(1), any such application must be accompanied by an affidavit executed by

the owner of the information which identifies the document or part sought to

\\

l

,

>8.10e04o n ?

Q

'

- .

-- -

.

- .

---

..

.

-

.

Connecticut Yankee Atomic Power

2

Company

be withheld, and which contains a full statement of the reasons on the basis

which it is claimed that the infonnation should be withheld from public dis-

closure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Docu-

ment Room. The telephone notification of your intent to request withholding,

or any request for an extension of the 10-day period which you believe necessary,

should be made to the Supervisor, Files, Mail and Records, USNRC Region I, at

(215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

~

Sincerely,

,

.

.

Eldon J.

runner,

ie

rojects

Branch #1, Division of esident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspectic -

Report Number 50-213/81-03

cc w/encls:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

J. F. Opeka, System Superintendent, Nuclear Operations

-