ML20004C573
| ML20004C573 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 05/21/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20004C571 | List: |
| References | |
| 50-213-81-03, 50-213-81-3, NUDOCS 8106040289 | |
| Download: ML20004C573 (1) | |
Text
.
V APPENDIX A NOTICE OF VIOLATION Connecticut Yankee Atomic Power Company Haddam Neck Plant License No. DPR-61 Docket No. 50-213 As a result of the inspection conducted on March 1,1981 - April 10,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.
Technical Specification 6.8.1 states in part:
" Written procedures and administrative policies shall be established, implemented and maintained...."
Quality Assurance Procedure 1.2-11.2 states in part:
"5.1 The department head'or designated alternate of each department shall review the test results and test data sheets for all surveillance tests...and shall evaluate the test results to assure that the test requirements have_been. satisfied."
Contrary to the above, surveillance test results for SUR 5.1-4, which was performed on March 6, 1981, were reviewed and approved by a person other than the appropriate department head or his designated alternate, and the test results did not satisfy the Technical Specification requirements.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Connecticut Yankee Atomic Power Company is hereby required to submit to this office within twenty-five' days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
f..
2iM l
Dated pp Vdon J. Bru' ner, f
rojects 4 ranch #1, ivisia sident and Projec Inspec o l
i l
81060402d
--