ML20004C291

From kanterella
Jump to navigation Jump to search
Ack Receipt of Transmitting Interim Rept Re Backfill Matl & Status of Structural Backfill Investigation Per IE Insp Repts 50-498/79-19 & 50-499/79-19,in Response to 800430 Order to Show Cause
ML20004C291
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/19/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20004C292 List:
References
NUDOCS 8106020504
Download: ML20004C291 (1)


See also: IR 05000498/1979019

Text

,

..

.

UNITED STATES

v "%g%,

j

NUCLEAR REGULATORY COMMISSION

j

'

'

, ,I

"" YRL$ G d, T A$ 6O 2

S, ...../

May 19, 1981

'

' $1

Zn Reply Refer To:

,

R8V-

e,0

4

Dockets 50-498/Rpt. 79-19

jQ

50-499/Rpt. 79-19

jgy

y,

-

,a

.

Q

(L;-

^' )

.

4

M

Houston Lighting and Pcwer Company

Y

j[. /

,

/

ATTN: Mr. G. W. Oprea, Jr.

,7

'

"

j W'I

Executive Vice President

-

s

M

>

1

Post Office Box 1700

'

Houston, Texas 77001

=

Gentlemen:

1

Thank you for yo.tr letter of December 17., 1980, which transmitted an

interim report concern.1 backfill material and status of the structural

backfill investigation in .asponse to the NRC Order to Show Cause, dated

_

April 30,1980. We will review this documentation and implementation of

corrective actions during fut"re inspections.

-

Sincerely,

-

/y ,// s&

,

/

[I

W. C. Seidle, Chief

Engineering Inspection Branch

y

i h

I

8106 02 0 @h

~

.

-

-

_

.-

.

.. .

.

- . .

.

.

.

l

f%U

-

.

The Light

Company soo,,oo tis iing & gos ,

s

e.o. sex iroo soo,,on.1,x2,77001 (713) 228-9211

December 12, 1980

ST-HL-AE-583

SFN: V-0530

Mr. Karl Seyfrit

Director, Region IV

Nuclear Regulatory Comission

611 Ryan Piaza Orive, Suite 1000

Arlington, Texas 75012

Dear Mr. Seyfri :

South Texas Project

Units 1&2

Docket Nos. STN !.J-498, STN 50-499

Third Interi- Pport Concerning

Backfill tiater y; and Status

Concernirg Shcw Cause Item 2

Structural Backfill IrvesticItton

.

On March 21, 1980, cursuant to 100F050.55(e), Hcusten Lignting i Power Cemeany

notified ycur office of an item ccncernin; certain non-conferring backfili material

areas located arounc the Souts Texas Unit n2 ocwer bicck. Tne intent Of this recert

and its attach:rients M to ::rovide a status on the structural

b._f. fill investiga:icn

and to address various related tasks wnicn have osan prev 1cusly icentifiec *.o youe

o f fi c.c . The attac.100 Indace m n: Review Ccemittee recort sucolc~er.ts tne crevic;s

Ocemittee interim recort, anicn was sucmitted as Exnici; 9' in our Re:conse to tne

Ords- to Shcw Cause, July 23., 1960. Ini: 5tatus rapert provides discussiens

concluding the folicwing 3;ecific activities.

Activities Ccmciated 3y The incenendent Review "c=i . ee

The following tasks identified on 03.2-5 and 2-6 of the Shcw Cause Order recly

have been ccepleted:

1.

Revie,ving inoratory tests and design inalyses :erfor .ad on the backfill

Concerning liquefGCticn lfid settlement.

Ccmoleted; see section 3.1 of Status Report.

2.

Reviewing the recnenda-ion 3nd criteria far ccm action o# to? Oacdill

as cocumen ed in i series of geot+chr.ical eng:Hering reports is:ued cy

'codward Cljde Consd tants '"CC}.

<:

Complet:d; we tact on 3..' .:f 5ts:us ;epcet.

i

8106 02 0 h)

.

.

.

,

.

.

Houston Lighdng & Power Company

December 12,1980

ST-HL-AE-583

~

SFN: V-0530

Page 2

3.

Reviewing the construction specifications and procedures for ccmoaction of

the backfill, including the actual construction and quality control methods

.

employed in the field.

Completed; see section 3.3 of Status Report.

Rev ewing the prescribed and implemented inspection and testing procedures

i

4.

for compaction control of the backfill placement, including the quality

control methods .nd documentation implemented in the field.

The Committee has finished the review of the procedures, and has found them

satisfactory. The task will be completed when the Task Force Review of the

quality control records becomes available (see item 5, below).

5.

Reviewing and analyzing comcaction quality control test results collected and

documanted covering the construction period from 1976 to 1980.

This task remains open pending the Task Force comol'etion of the quality

control documentation review and ccmpilaticn.

6.

Reviewing the results of special investigations of the placed backfill to assess

adherence to the design requirements, including the results of the test boring

program performed during the spring of 1980.

Completed; see section 3.6 of Status Report.

7.

In the event low density pockets are deliciated in the backfill, reviewing the

efficiency of the methods proposed by B&R Engineering to treat those pockets

to bring them into conformance with the design requirements.

Complete as no remedial work is required; see section 3.7 of the Status Report,

and close out of the structural backfill boring investigation findings

pertaining to the low density indication west of the Unit 2 Reactor Containment

Building, as discussed below.

8.

Inspecting the on-site laboratory facilities and equipment used oy the existing

testing agency, and reviewing the laboratory test procedures.

Completed, see section 3.8 of Status Report.

9.

Reviewing the precedures, observing field operations, and evaluating tne results

of the test fill program.

Ccmpleted, see section 3.9 of Status Report.

P00R ORIGINAI.

.

.

-

.

.

Houston Lighting de Power Company

December 12, 1980

ST-HL-AE-583

SFN: V-0530

Page 3

Low Censity Indications: Construction Deficiency

Borings with Standard Penetration Tests obtained by Woodward-Clyde , Consultants

(WCC) in January-February 1980, gave indications of densities below the

construction quality control criteria in an area near the subgrade west of the

Unit 2 Reactor Containment Building. The area was subject to further investiga-

tion by borings obtained in March and April ,1980.

WCC has made a final evaluation of the test results has studied the validity

of the test methods. WCC's report dated September 30, 1980 is attached.

The field investigation and test results have prcviously been evaluated by the

Independent Review Committee as discussed in sections 2.8 and 4.0 of the

Committee's Interim report (Exhibit 9 to the July 23, 1980 response to the

Order to Show Cause). WCC"s final evaluation confirms that the test data is correct,

and also that the density of the backfill is satisfactory. The same conclusien

is also reiterated in Section 3.7 of the Committee's status report. There is

accordingly no need for any remedial work.

The status report also addresses the ongoing work by the task force. The final

Committee assessnent of these items will be contained in the comprehensive

report currently scneduled for submittal in February,1981.

If there are any questions, please contact Mr. Michael E. Powell at (713) 575-

8592.

Very trug yqurs,

,Lf

/

d., ,<,p rd,4F/~'

d Execd.ive 'liWPresident

MEP/pjb

Attachments

200R ORIGINAL.

.

!

l

.

.

.

Houston Lighting & Power Onnpany

December 12, 1980

1

ST-HL-AE-583

SFN: V-0530

Page 4

cc:

J. H. Goldberg

D. G. Barker

Howard Pyle

R. L. Waldrop

H. R. Dean

-

D. R. Beeth

J. D. Parsons

i

G. B. Painter

'

L. K. English

A. J. Granger

R. A. Frazar

H. S. Phillips

(NRC)

il. O. Read

(Read-Poland,Inc.)

M. D. Schwar:

Baker & Botts)

i

R. Gordon Gooch

Baker & Botts)

l

J. R. Newman

Lowenstein, Newman, Reis, Axelrad & Toll)

Director, Office of Inspection & Enforcement

Nuclear Regulatory Cormission

Washington, D. C. 20555

.

-

P00R ORIGINAL

.

,

Houmin Ughting & Power Conipany

December 12,1980

ST-HL-AE-583

SFN: V-0530

Page 5

M. L. Borchelt

Executive Vice President

Central Power 5 Light Company

P. O. Box 2121

.

Corpus Christi, Texas

73403

R. L. Range

Central Power 5 Light Company

P. O. Box 2121

Corpus Christi, Texas

78403

R. L. Hancock

Director of Electrical Utilities

City of Austin

P. O. Box 1088

Austin, Texas

78767

T. H. Stuehlenbeck

City of Austin

P. O. Box 1088

Austin, Texas

73767

J. B. Poston

Assistant General Manager of Operations

City Public Service Board

P. O. Box 1771

San Antonio, Texas

73296

A. vonRosenberg

City Public Service Board

P. O. Box 1771

San Antonio, Texas

78296

.

.

. - _ _ - _ _ _ _ _ _ _ - _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ .

___

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

'

.

.

.

Houston Lighting & Power Company

December 12, 1980

ST-HL-AE-583

SFN: V-0530

Page 6

Charles Bechaefer, Esquire

Chairman, Atomic Safety & Licensing Board

U. S. Nuclear Regulatory Ccmmission

Washington, D. C. 20555

Dr. James C. Lamb, III

313 Woodhaven Road

Chapel Hill, North Carolina 27514

Dr. Enneth A. Luebke

Atomic Safety & Licensing Commission

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555

Citizens for Equitable Utilities

c/o Ms. Peggy Buchorn

Route 1, Box 1684

Brazoria, Texas 77422

Pat Coy

Citizens Concerned About Nuclear Power

5106 Casa Oro

San Antonio, Texas 77422

-

.

Betty Wheeler

Hoffman, Steeg & Wheeler

1008 S. Madison

Amarillo, Texas

Brian E. Aerwick

Assistant Attorney General for the State of Texas

P. O. Box 12548

Capitol Station

Austin, Texas 78711

Bernard M. Bordenick

Hearing Attorney

Office of the Executive Legal Director

'

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555

l

l

.-.

.-.

- --

-

-

_

.. ..

.

.

- . _ , . ,

-.

,-

.

CONSULTANTS

Wimn L snannon. P L

stanaev O. wieson. P.L

. cqv. 4

"

SHANNON & WILSON,1NC.

Geotechnical Consultants

1105 North 38th Street Seattle, Washington 98103 Telephone:(206) 632-8020 + Cable: GEOSAW

October 27,1980

-

SHR-1000-02-0

.77~-M-3K - 00 2 0

'

Brown & Root, Inc.

,

P.O. Box Three

i

Houston, Texas 77001

' T'

Attn:

Mr. J. L. Hawks

'

Engineering Project Manager

.

EXPERT COMMr1 TEE'S STATUS P2 PORT ON

ADEQUACT OF CATEGORY I STRUCTURAL BACKFILL

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

Gentlemen:

Mr. Wilson, the Expert Committee's chairman, has asked me to transmit 10 copies of

the above referenced report to you.

Sincerely,

SHANNON & WILSON, INC.

.

L G. tL4A D

Thomas E. Kirkland, P.E.

Principal Engineer

r

! l*

t.

TEKAcc

Enc 1:

Report

,

t

.

1

.

.

.

-

.

.

,

u. <>c. c.v..icn. p.c.

o

,o. v.<n n.. P.E

i

m.ymona p. um . e t

we. p . ni

we. e,.

at

sen

we. p..w.n .no uan ,

! -.

_

_

_

. .

.

_ _ _ . _ _

.

. .

.

.

.

_ . . _ . _ _ .

.

__