ML20004C015

From kanterella
Jump to navigation Jump to search
Forwards LER 81-048/01T-0
Date released: 01/18/2020 Download: ML20004C015


LER 81-048/01T-0:on 810513,while Evaluating RIP Isolation Valve Failure,Eccs Actuation Instrument E41-LSH-NO15B Isolation Was Not Recognized.Caused by Personnel Emphasis on Returning Isolation Valve to Svc.Control Switch Replaced
ML20004C016
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/22/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C016 (2)
Forwards LER 81-048/01T-0
ML20004C014
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/22/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004C014 (1)