Part 21 Rept Re Brown & Root Heating,Ventilation & Air Conditioning Design,Initially Reported on 810508.Conceptual Design for Supplemental Sys Based on Equipment Design Qualification Temps Will Be Completed by mid-June 1981
ML20004C012
Person / Time
Site: South Texas  
Issue date: 05/12/1981
From: Rice W
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-81-429-000 PT21-81-429, PT21-81-429-000, NUDOCS 8106010418
Download: ML20004C012 (4)


Text

--.-- _ _c._o- _ _

% /w PART 21 IIEfilFICATlbN NO.

ffVM- 0 o a " CCFPANf IME (b-

,IMTE 0: LETER.

s[7/f7 D0DEf R3. *-Wf D;TE DISTRIBUTED ORIGI!ML REo0RT[SlF?LEFBiT DISTRIBlEION:

REACTOR (R) /

FUEL CYCE &

SAFEGlMRDS (S)

IE FIES

[MTERIA3 @

IE FIES EES - } wilde IE FIES AD/SG AD/FFFSI AD/RDI REGI3G I,II,III,IV,V REGIONSI,II,III,IV,V P GIONS 1,ll,Ill,IV,V VEND 3R BR. R-IV VE03R BR. R-IV VdO3R BR, R-IV LO3 / t'PA FIG 5715 liSS / FGS SS-395 NRP/D3L AE0D FIG 7602 l

/ FFA I;1,3 5715 gSS / SG SS-881 l

ctteri u s m ne,z n

~

NRs/D0_-

AEOD FIG 7602 LEB / FPA FIG 5715 QtLdTynu. mnB 7zn N?NDSI ASLB? E/d 450 AE0D PTG 7602 IR E T Clfcrdus mas 7tn i SAo/SP fig-7210A ASLBP E/W 450 -

NPWD3L CENTPAL FIES 016 ENTPAL FILES 016 ASB?

E/d 450 CBERE FIES ( GPUC CBERAL FILES (GRO.'O CENTRALFILES 016 PDR CBUPAL FIES SS-395 CSJRAL FIES (DiROFD LPDR PDR lEPA[hx LPDR PDR

.[ gh jh "A

'9R M

9-g, 7.,6 H2 ACTION:

5 $. TM 1

PRELIMINARY EVALUATION OF THE'ATTAC. ' /FJc,@t ICATES MAD RESPONSIBILITY FOR FOU.OWJP AS SFDhN BELOW:

NE [

is ]

c7133 eES 81060101118 IEV. 8/_1/8_,_

h hhd0 Brown ffRoot,Inc. east orrice 80x Taree, nouston. Texas 7700, A Halliburton Company m.. n. R;c.

  1. M*P%

M;g4' c, vie.p,.a..

Powee Group (713) 676-3521 9 v 12, 1981 Mr. Victor Stello, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commissicn Washington, D. C. 20555

Dear Mr. Stello:

On May 8,1981, Dr. K. M. Broom of Brown & Root, Inc. provided verbal notification to the Nuclear R.egulatory Comission, Region IV Office of Inspection and Enforcement, of a defect in Brown & Root HVAC design determined to be reportable pursuant to 10CFR21.

This letter provides written notification of the reportable condition in accordance with 10CFR21.

Brown & Root, Inc. of Houston, Texas is the Engineer and Constructor of the South Texas Project Nuclear Generating Station (STP) located near Bay City, Texas.

In April 1980, Houston Lighting & Power Company (HL&P),

the Construction Permit holder for STP, expressed a concern with tne ventilation cooling of the radwaste control rc a in the Mechanical Auxiliary Building (MAB).

Based on this concten, Brown & Root formed a special study group and initiated an overall review of safety-related HVAC requirements for STP, units 1 and 2.

As the result of Brown &

Root's preliminary assessmerd., in September 1980 specific plant areas were identified which required additional study. These areas consist of spaces / cubicles which contain various safety-related or Class IE equipment in the Mechanical and Electrical Auxiliary Building (MEAB) and the Fuel HandlingBuilding(FHB). The areas and equipment of concern are listed in Table 1 (attached). The review of HVAC design indicated that environ-mental control requirements for various safety-related or Class IE equipment during certain modes of plant operation and/or certain postulated plant events may not have been taken into account.

In March 1981 a draft report was prepared by Brown & Root which sum-marized preliminary thermal environmental data received to date.

These preliminary data indicated the need to provide supplementary cooling to various spaces / cubicles within the MEAB and FHB which contain equipment that may be necessary for plant shutdown and/or decay heat removal under certain postulated conditions. Lack of adequate cooling may jeopardize the continued operability of this equipment during shutdown situations.

l Mr. Victor Stello, Director May 12, 1981 Page 2.

Brown & Root responded to the apparent design inadequacies by initiating the development of potential corrective actions which has been in process.

On May 7,1981, the results of an independent review affirmed Brown &

Root's preliminary indication. The independent review concluded that there may be insufficient HVAC cooling capacity for equipment located in the MEAB and FHB. Although all final heat load data have not currently been developed by Brown & Root, sufficient uncertainty exists with the adequacy of HVAC design for STP, Units 1 and 2 that Brown & Root determined this reportable pursuant to 10CFR21 on May 8,1981.

Brown & Root is continuing its evaluation of HVAC requirements for the MEAB and FHB.

By mid-June 1981, Brown & Root expects to have developed a conceptual design for supplemental HVAC based on equipment design qualification temperatures and equipment heat losses for all modes of plant operation. The design modifications will supplement the existing HVAC design which is presently released for construction.

Final HVAC design will be consistent with equipment operability requirements to achieve safe shutdown under the most limiting conditions of plant events as required. Specific design modifications are dependent upon the results of our current evaluation. We shall provide an update of our activities by July 1, 1981.

Additional questions regarding this matter should be addressed to Mr. K.

R. Cook, (713) 676-8860.

Very truly yours, BROWN & ROOT, INC.

I, J

~

W a

W. M. Ric Group Vice President WMR/PSJ/smk cc:

Karl V. Seyfrit, Director Office of Inspection and Enforcement - Region IV U. S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76102 D. G. Barker, Manager South Texas Project Electric Generating Staticr, Houston Lighting and Power Company P. O. Box 1700 Houston, Texas 77001

ot TABLE 1 i

CANDIDATES FOR NEW HVAC SERVICE EQUIPMENT REQUIRING LOCATION TEMP CONTROL Radwaste Control Room, MAB H2 Monitoring Equip.

Electrical Penetration Space, EAB Class IE Cables Reactor make-up water Pumps Reactor make-up Water Pumps Cubicle, MAB Spent Fuel Pool Pump Cubicles, FHB SFPCCS Pumps Boric Acid Transfer Pumps Cubicle MAB Boric Acid Transfer Pumps Cont. Iso. Valve Cubicles, FHB Cont. Iso. Valves B&R Valve (3 cubicles)

Nos.:

XSI 004A, B, C XSI 018A, B, C XCS 001A, B, C Valve Cubicles in MAB (3 cubicles)

CVCS Valves used for boration B&R Valve Nos.:

XCV 218 XCV 112C XCV 113B XCV 1128 XCV 113A Elect. Aux. Bldg. Chiller Area EAB Chillers (located in MAB)

. _ _ -