e
o,,
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
o
{
r
REGION V
o,
g
1990 N. CALIFORNIA BOULEVARD
% e,,,e ,e
SulTE 202, WALNUT CREEK PLAZA
-
WALNUT CREEK. CALIFORNIA S4506
May 26, 1981
-
Docket No. 50-206
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject: NRC Inspection of San Onofre Unit 1
This refers to the inspection conducted by Mr. W. J. Wagner of this Office
on May 12-15, 1981 of activities authorized by NRC Licensee No. OPR-13, and
to the discussion of our findings held by Mr. Wagner with Mr. Curran and
other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
,
l
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
'
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within 25
days from the date of this letter a written application to this office
to withhold such information. If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
Tgo\\9k
II
81060103W
Q
l
.
.
.
-
.
.
O
Southern California Edison Company
-2-
May 26, 1981
please notify this office promptly so that a new due date may be established.
Consistent with section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identifies
the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section
further requires the statenent to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, the report will be placed in the public Document
Room.
Should you have any questions concerning this inspection, we will be glad
1
i
to discuss them with you.
Sincerely,
c
l
37
M
,
B. H. Faulkenberr
-
Reactor Cor.sti:yction Projec
ranch
Enclosure:
IE Inspection Report
No. 50-206/81-16
,
cc w/o enclosure:
R. Dietch, Vice President,
Nuclear Engineering & Operations. SCE
'
J. M. Curran, SCE, San Clemente
.
+
, - - - -