Forwards IE Insp Rept 50-206/81-16 on 810512-15.No Noncompliance Noted
ML20004B943
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/26/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20004B944 List:
References
NUDOCS 8106010341
Download: ML20004B943 (2)


See also: IR 05000206/1981016

Text

e

o,,

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

o

{

r

REGION V

o,

g

1990 N. CALIFORNIA BOULEVARD

% e,,,e ,e

SulTE 202, WALNUT CREEK PLAZA

-

WALNUT CREEK. CALIFORNIA S4506

May 26, 1981

-

Docket No. 50-206

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection of San Onofre Unit 1

This refers to the inspection conducted by Mr. W. J. Wagner of this Office

on May 12-15, 1981 of activities authorized by NRC Licensee No. OPR-13, and

to the discussion of our findings held by Mr. Wagner with Mr. Curran and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

,

l

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

'

by telephone within ten (10) days from the date of this letter of your

intention to file a request for withholding; and (b) submit within 25

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

Tgo\\9k

II

81060103W

Q

l

.

.

.

-

.

.

O

Southern California Edison Company

-2-

May 26, 1981

please notify this office promptly so that a new due date may be established.

Consistent with section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies

the document or part sought to be withheld, and which contains a full

statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section

further requires the statenent to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the public Document

Room.

Should you have any questions concerning this inspection, we will be glad

1

i

to discuss them with you.

Sincerely,

c

l

37

M

,

B. H. Faulkenberr

-

Reactor Cor.sti:yction Projec

ranch

Enclosure:

IE Inspection Report

No. 50-206/81-16

,