Forwards IE Insp Rept 50-412/81-01 on 810202-05.No Noncompliance Noted
ML20004B747
Person / Time
Site: Beaver Valley
Issue date: 03/02/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML20004B748 List:
References
NUDOCS 8105290470
Download: ML20004B747 (2)


See also: IR 05000412/1981001

Text

.

s

arog'o

y

UNITED STATES

e

,,

[

v.,

g

NUCLEAR REGULATORY COMMISSION

3g

9j

REGION I

Q,

4

631 PARK AVENUE

% . * * ,d

KINO oF PRUSSIA, PENNSYLVANIA 19406

+

Mali 0 % 'da)

6, \\ FI I no

Q.

W,j\\

Docket No. 50-412

h @g p-. J.,

I h

~

s

Duquesne Light Company

ATTN: Mr. E. J. Woolever

w

Vice President

2j MAY 2 7 19S1

1

'

435 Sixth Avenue

j U'5e mann erwrm ~f

"**

J

Pittsburgh, PA 15219

N

Q

g'b

Gentlemen:

q

Subject:

Inspection 50-412/81-01

This refers to the routine inspection conducted by Mr. A. A. Varela of this

office on February 2-5, 1981 at the Beaver Valley Nuclear Power Station, Unit

2, Shippingport, Pennsylvania of activities authorized by NRC License No.

CPPR-105 and to the discussions of our findings held by Mr. Varela with Mr. R.

Washabaugh at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must be accomoanied by an affidavit executed by the owne. of

the information, which identifies the document or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be witnheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we ao not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

81052,9y @

. .

.

_

e

&

Duquense Light Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/

f

W

i

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-412/81-01

cc w/ encl:

R. J. Washabaugh, Quality Assurance Manager

.

.