g*" "%r

  • -

g

UNITED STATES

[ .+

NUCLEAR REGULATORY COMMISSION

]

i .N)I5

REGION IV

i# .-/

611 RYAN PLAZA DRIVE. SUITE 1000

%,

ARLINGTON, TEXAS 76011

,

May 12, 1981

1

In Reply Refer to:

Docket 50-382/81-08

-3%

/h,

!

Louisiana Power and Light Company

'3b

ATTN:

D. L. Aswell, Vice President

q [ bg'\\bg

4 -

I'

\\

Power Production

142 Delaronde Street

n,g% #

New Orleans, Louisiana 70174

--

h(- p/c.#

Gentlemen:

s

.c

This refers to the inspection conducted under the Resident InspectibTyrog{pt'h[

by Mr. G. L. Constaole of our staff during the period March 16, 1981\\- % UR-

April 15,1981, of activities authorized by NRC Construction Permit C(PR-103

for Waterford Steam Electric Station, Ui.it 3, and to the discussions oN~

findings with Mr. D. B. Lester at various times during the inspection.

Principal areas examined during the inspectica included:

(1) Operational

Staffing, (2) Quality Control, (3) Training, and (4) Plant Tour. Within these

_

areas, the inspection consisted of selective examination of representative

records, interviews with personnel and ob.iervations by the inspector.

During this inspection period the Resident Inspector assisted in the inspection

effort related to drugs on the Waterford-3 site and was involved in meetings

with public officials of St. John the Baptist Parish and St. Charles Parish.

The results of these activities are contained in Inspection Reports 50-382/81-07

and E0-382/81-09, respectively.

Within the scope of the inspection, no violations or deviations were identified.

1

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this raport contains any infomation that you believe to be

exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)

notify this office by telephone within 10 days from the date of this letter

of your intention to file a request for withholding; and (b) submit within

,

l

25 days from the d&ce of this letter a written application to this office to

withhold such infomation.

If your receipt of this letter has been delayed

'

such that less than seven days are available for your review, please notify

this office promptly so that a new due date may be established. Consistent

!

with Section 2.790(b)(1), any such application must be accompanied by an

l

affidavit executed by the owner of the infomation which identifies the

document or part sought to be withheld, and which contains a full statement

,

'

of the reasons on the basis which it is claimed that the infomation should

!

  • \\

5

$1052704]c

. . -

_-

-

.

.

,.

Louisiana Power and Light

2

May 12, 1981

Company

be withheld from public disclosure. This section further requires the stata-

ment to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within tre specified periods noted above, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

k

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

IE Inspection Report 50-382/81-08

.

!

l

t

!

,

,