f*" %%
UNITED STATES
.it
NUCLEAR REGULATORY COMMISSION
-: .+
. . . -
3*
j
REGION IV
S
8
611 RYAN PLAZA DRs.'E StP*L 1000
-.
,,,,8
ARUNGToN. TEXAo 76011
Reply Refer To:
May 8, 1981
[
4
'q
'
y
Docket Nos. 50-498/Rpt. 81-12
lD.
[
',
50-499/Rpt. 81-12
J]
g
g
g. A gN
R
Nk
h
Houston Lighting and Power Company
4
,
f
ATTN: Mr. G. W. Oprea, Jr.
N
g
y
Executive Vice President
Post Office Box 1700
Houston, Texas 77001
Gentlemen:
This refe;3 to the inspection conducted by our Resident Reactor Inspector,
Mr. H. S. Phillips, during April 1981, of activities authorized by NRC
Construction Permits CPPR-128 and CPPR-129 for the South Texas Project,
Units 1 and 2, and to the discussions of our findings with Mr. R. A. Frazar
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
-
with personnel, and observations by the inspector.
Within the scope of the inspection, no violations or deviations were identified.
We have also examined actions you have taken with regard to previously identified
inspection findings. The status of these items is identified in paragraphs 2
cnd 3 of the enclosed report.
One new unresolved item is identified in paragraph 2 of the enclosed report.
I
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe to
,
l
be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you
l
(a) notify this office by telephone within 10 days from the date of this letter
l
of your intention to file a request for withholding; and (b) submit within 25
days from the date of this letter a written application to this office to
'
withhold such information.
If your receipt of this letter has been delayed
such that less than seven days are available for your review, please notify
this office promptly so that a new due date may be established. Consistent
with Section 2.790(b)(1), any such appli:ation must be accompanied by an
affidavit executed by the owner of the information which identifies the
.
document or part sought to be withheld, and which contains a full statement
l
of the reasons on the basis which it is claimed that the information should
igo\\sii
i
l
m o N%
8105 ode v k
.
.
Houston Lighting and Power
2
May 8, 1981
Company
be withheld from public disclosure. This section further requires the state-
ment to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified periods noted above, the report will be placed in the
Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
te discuss them with you.
Sincerely,
hj0ffa8W
G. L. Madsen, Chief
Reactor Projects Branch
Enclosure:
IE Inspection Report No. 50 498/81-12