Forwards IE Insp Repts 50-498/81-12 & 50-499/81-12 During Apr 1981.No Noncompliance Noted
ML20004B246
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/08/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20004B247 List:
References
NUDOCS 8105270442
Download: ML20004B246 (2)


See also: IR 05000498/1981012

Text

,

_ .

f*" %%

UNITED STATES

.it

NUCLEAR REGULATORY COMMISSION

-: .+

. . . -

3*

j

REGION IV

S

8

611 RYAN PLAZA DRs.'E StP*L 1000

-.

,,,,8

ARUNGToN. TEXAo 76011

Reply Refer To:

May 8, 1981

[

4

'q

'

y

Docket Nos. 50-498/Rpt. 81-12

lD.

[

',

50-499/Rpt. 81-12

J]

g

g

g. A gN

R

Nk

h

Houston Lighting and Power Company

4

,

f

ATTN: Mr. G. W. Oprea, Jr.

N

g

y

Executive Vice President

Post Office Box 1700

Houston, Texas 77001

Gentlemen:

This refe;3 to the inspection conducted by our Resident Reactor Inspector,

Mr. H. S. Phillips, during April 1981, of activities authorized by NRC

Construction Permits CPPR-128 and CPPR-129 for the South Texas Project,

Units 1 and 2, and to the discussions of our findings with Mr. R. A. Frazar

and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

-

with personnel, and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

We have also examined actions you have taken with regard to previously identified

inspection findings. The status of these items is identified in paragraphs 2

cnd 3 of the enclosed report.

One new unresolved item is identified in paragraph 2 of the enclosed report.

I

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe to

,

l

be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you

l

(a) notify this office by telephone within 10 days from the date of this letter

l

of your intention to file a request for withholding; and (b) submit within 25

days from the date of this letter a written application to this office to

'

withhold such information.

If your receipt of this letter has been delayed

such that less than seven days are available for your review, please notify

this office promptly so that a new due date may be established. Consistent

with Section 2.790(b)(1), any such appli:ation must be accompanied by an

affidavit executed by the owner of the information which identifies the

.

document or part sought to be withheld, and which contains a full statement

l

of the reasons on the basis which it is claimed that the information should

igo\\sii

i

l

m o N%

8105 ode v k

.

.

Houston Lighting and Power

2

May 8, 1981

Company

be withheld from public disclosure. This section further requires the state-

ment to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified periods noted above, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

te discuss them with you.

Sincerely,

hj0ffa8W

G. L. Madsen, Chief

Reactor Projects Branch

Enclosure:

IE Inspection Report No. 50 498/81-12

50-499/81-12

-